York Gas Field

Related Pages

UK Oil & Gas Fields

Centrica Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Centrica
  • Country: UK
  • Location: Southern North Sea
  • Production start: 2013
  • Partners: 100%
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The York platform is an unmanned facility with a tie back to Centrica’s Easington Gas Processing Terminal via a 34 km (21.25 miles) 16 inch pipeline.
  • The York Field Development will exploit gas reservoirs in the Southern North Sea of the UK Continental Shelf, approximately 35 kilometres North-East of Easington.

Contractors

  • Heerema: EPCI (Engineering, Procurement, Construction and Installation) contract of the 2,750 tonnes York platform
  • Saipem: Pipeline installation
  • FoundOcean: Grouting

History

  • 2001 - York Gas Field discovered by Amerada Hess
  • 2003 - Centrica acquired a 23% stake
  • 2009 - Centrica acquired an additional 67% stake from Hess
  • 2011 - Heerema awarded Centrica York platform contract
  • 2013 - First gas produced

Geology

Links

  1. List Of Oil and Gas Production Platforms In The UK
  2. FoundOcean Subsea References
  3. Saipem Europe Pipeline References
  4. HFG awarded Centrica York platform contract
  5. Centrica acquires additional 67 per cent share in North Sea gas development
  6. North Sea Gas Success For Amerada Hess
  7. Centrica Energy announces production has started from its York platform

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License