Yacuiba To Rio Grande Gas Pipeline Gasyrg

Summary Information

  • Source: Yacuiba
  • Destination: Rio Grande
  • Ownership: Transierra
  • Website: http://www.transierra.com.bo/
  • Length: kilometres ( miles)
  • Capacity: 17.6 MMm3/day
  • Status: Operating


  • The pipeline runs from Yacuiba, province of Tarija, to Rio Grande, province of Santa Cruz de la Sierra
  • The Gasyrg pipeline is 432 kilometer in length, 32 inches in diameter and is buried along its entire length
  • It connects with the Bolivia Brazil Gas Pipeline GSA in Rio Grande
  • The pipeline transports gas from the San Alberto Gas Field


  • 2003 - Pipeline began operations
  • 2004 - Capacity increased

Other Information

  • -


  1. IFC Project Page

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License