Weizhou 12-1 Oil Field
Related Pages
China Oil & Gas Fields
CNOOC Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: CNOOC
- Country: China
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- WZ 6-1 was developed as a satellite utilising one unmanned wellhead platform
- WZ11-1 is also a a satellite utilising one producing platform, and WZ11-1E is tied back to it
- Weizhou 11-2 oil field is also sharing facilities
Contractors
- Hyundai Heavy Industries: Topside & Living Quarter
- Heerema Marine Contractors: Transport and Installation
- UOCC: WZ 11-1 Jacket & Topsides
- COOEC: WZ 11-1N Jacket & Topsides
- Hilong: Weizhou PIP
History
- 2006 - Production starts from WZ 6-1
- 2007 - First production from WZ11-1
- 2010 - WZ11-1E oil field started production
- 2012 - Production starts from Weizhou 11-2 oil field
Geology
Links
- Hyundai Heavy Industries Platform References
- FoundOcean Subsea References
- Serimax Pipeline References
- Serimax Asia Pipeline References
- International Protective Coatings Platform References
- CNOOC Ltd. Starts Production from WZ 6-1
- CNOOC Ltd. Announces the Startup of WZ 11-1
- CNOOC Ltd. Announces the Startup of Two Fields
- Two New Oil Fields in Beibu Gulf Start Production Successfully
page revision: 11, last edited: 27 Jul 2015 11:43