Vampire, Viscount And Valkyrie Gas Fields

Related Pages

UK Oil & Gas Fields

Conoco Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Conoco Phillips
  • Country: UK
  • Location: 049/16
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
  • The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
  • Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
  • Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant

Contractors

  • Odebrecht: T&I for Vampire platform

History

  • 1998 - Vampire development approval granted
  • 2002 - Development approval for Viscount
  • 2004 - Valkyrie granted development approval

Geology

Links

  1. List Of Oil and Gas Production Platforms In The UK
  2. UK Oil and Gas Fields by Approval Date
  3. Seaway Heavy Lifting Europe Oil And Gas References

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License