Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
Major Projects – Pipelines (U.S. & Canada)
Oil Pipeline Projects
- Minnesota Oil Pipeline
- Minnesota Pipe Line Company -‐ MinnCan Project
- UniversalPegasus provided project management, survey, design engineering, GIS, construction management and inspection services, for 304 miles of 24” crude oil pipeline from the Flint Hills Resources Refinery to Clearbrook, Minnesota.
- The pipeline is operated by Koch Pipeline Company and was completed in 2008.
- TransCanada -‐ Express Pipeline Project
- UniversalPegasus performed engineering design, preliminary and as-‐built survey, material procurement, drafting and construction management services for 515 miles of 24” crude oil pipeline project in Montana and Wyoming.
- The work included technical support for right-‐of-‐way acquisition and environmental permitting.
- Keystone XL Pipeline Project
- TransCanada -‐ Keystone XL Pipeline Project (Phase I)
- UniversalPegasus provided preliminary and as-‐built survey, GIS, mapping, construction management, inspection, detailed design, and procurement services for 1,600 miles of 30” heavy crude pipeline with multiple HDD's from the Canadian border to Steele City, Nebraska, with a line to Patoka, Illinois.
- The interstate project crosses North Dakota, South Dakota, Missouri, Kansas, Illinois and Nebraska & was completed in 2009.
- Keystone XL Pipeline Project
- TransCanada -‐ Keystone XL Pipeline / Cushing Extension Project (Phase II)
- UniversalPegasus provided preliminary and as-‐built survey, GIS, mapping, construction management, inspection, detailed design and procurement services for 296.8 miles of 36” heavy crude pipeline. The interstate project crosses Nebraska, Kansas, and Oklahoma. The project was completed in 2010.
- Keystone XL Pipeline Project
- TransCanada -‐ Keystone Gulf Coast Project (Phase III)
- UniversalPegasus is providing preliminary survey, detailed engineering, GIS, drafting, construction management and inspection services to TransCanada for 484 miles of 36” heavy crude pipeline from Cushing, Oklahoma to the TX Gulf Coast near Beaumont. Included on this project is a 50 mile pipeline from Beaumont to the Houston, Texas marketplace.
- Keystone XL Pipeline Project
- TransCanada -‐ Keystone XL Pipeline / U.S. Steele City Project (Phase IV)
- UniversalPegasus is providing feasibility study, FEED, preliminary and as-‐built survey, GIS, mapping, detailed engineering, and inspection services for 855 miles of 36” heavy crude pipeline for TransCanada, from Montana/Canadian Border near Morgan, Montana to Steele City, Nebraska.
Natural Gas Pipeline Projects
- Alliance Gas Pipeline
- Alliance -‐ Natural Gas Pipeline Project
- UniversalPegasus performed route selection, FEED, FERC filing, cost estimating, detailed engineering design, drafting, survey, mapping, procurement services, project management and construction inspection, for the 888 mile U.S. portion 36” Alliance Natural Gas Pipelines Project.
- UniversalPegasus provided services for both the pipeline and the compressor stations required for the project. Two unique aspects of the project are the transportation of natural gas in a high-‐pressure dense phase and the use of automatic welding machines for pipeline construction, which was a first for onshore cross-‐country pipeline construction in the U.S.
- Gulf Crossing Gas Pipeline Company
- Boardwalk Pipeline Partners -‐ Gulf Crossing Pipeline Project
- UniversalPegasus provided survey, engineering design, mapping, drafting and project management for 357 miles of 42” high pressure natural gas pipeline extended from Sherman, Texas to Tallulah, Louisiana. The project also included two compressor stations in Texas and two compressor stations in Louisiana and five meter stations for the measurement and delivery of gas transported within the new pipeline system.
- Vector Gas Pipeline
- Enbridge -‐ Vector Pipeline Project
- UniversalPegasus performed engineering design, drafting, route selection, estimates, FERC application support, field survey, right-‐of-‐way acquisition, material procurement, project management, construction management, inspection, and start-‐up assistance services, for the 270 mile, 42” natural gas pipeline from Chicago, Illinois to Dawn, Ontario, Canada.
- Enbridge -‐ DC Pipeline Project
- UniversalPegasus provided project controls/administration, survey, right-‐of-‐way support, non-‐environmental permitting support, environmental permitting support, engineering/design, mapping, drafting, material management, construction contract management, startup and commissioning, as-‐builts and archiving for 270 miles of 36” natural gas pipeline from Bethel, Texas to Bridge City, Texas with a 24” lateral line from Crockett, Texas, including three (3) major pipeline interconnects and two (2) major compressor stations.
- Texas Intrastate System Gas Pipeline
- Enterprise Products – Sherman Extension Pipeline Project
- UniversalPegasus provided survey, GIS, construction management and inspection, detailed design, and procurement services for 178 miles of 36” diameter pipeline and two electric drive compressor stations. The pipeline originating at a central delivery point on Enterprise’s Texas intrastate pipeline system near Morgan Mill, Texas and extends through the center of the current Barnett Shale development area to Sherman, Texas where it connects with Boardwalk's 42” Gulf Crossing Expansion, which features interconnects with seven major interstate pipelines, including the Transcontinental Pipeline Company system that accesses markets in the Northeast. The project was completed in 2009 and will provide up to 1.1 billion cubic feet per day of transportation capacity for natural gas production from the growing Barnett Shale area of North Texas.
- Florida Gas Transmission Pipeline
- Florida Gas Transmission -‐ Phase III, V, VI, VII Projects
- UniversalPegasus performed survey, detailed engineering design, construction management, and inspection services for hundreds of miles of various diameter natural gas pipelines for FGT’s Phase III, V, VI, VII, and Turnpike replacement projects.
- The projects included 200+ miles of natural gas pipeline for Phase 5 and 6 for various looping sections of the FGT Pipeline as well as completing Phase 6 and 7 of the FGT Compressor Stations including the Turkey Point Compressor Station in Miami, Florida.
- The projects were completed throughout 2007-‐2008.
- Florida Gas Transmission Pipeline
- Florida Gas Transmission -‐ Phase VIII Project
- UniversalPegasus is providing s FERC filling, detailed engineering design, as-‐built drawings, construction management, and inspection services for 240 miles of 24”, 30”, and 36” pipeline and 10 compressor stations with 15 compressor units from Mississippi to Florida.
- The projected completion date is scheduled for 2010/2011.
- Gulf South Gas Pipeline System
- Gulf South -‐ East Texas to Mississippi Expansion Project
- UniversalPegasus provided survey, engineering design, mapping, drafting and project management for approximately 240 miles of 42” high pressure natural gas pipeline.
- The pipeline extended from Keatchie, Louisiana to Harrisville, Mississippi with three compressor stations located in Panola County, Texas, Ouachita Parish, Louisiana and Madison Parish, Louisiana.
- The project included five (5) meter stations for the measurement of receipt and delivery of natural gas transported.
- Rockies Express Gas Pipeline
- Kinder Morgan -‐ 42" Rockies Express Pipeline Project
- UniversalPegasus provided construction management, inspection, as-‐builts, engineering design, drafting, material specification, material procurement, and issued IFB and IFC drawings for 135 miles of 36” pipeline and 192 miles of the 42” pipeline in Colorado and Wyoming.
- The project was constructed in two spreads in late 2006 and placed in service in January 2007.
- TransColorado Gas Pipeline
- Questar Energy -‐ TransColorado Pipeline Project
- UniversalPegasus provided route selection, preliminary and as-‐built survey, engineering design, drafting, material procurement, project management, construction management, inspection, and start-‐up assistance services for the 292 mile, 22” interstate natural gas pipeline system from Colorado to Kansas.
- Regency Energy Partners -‐ North Louisiana Enhancement Project
- UniversalPegasus provided engineering design for the pipelines, multiple meter stations, right-‐of-‐way acquisition, environmental permitting, survey, preparation of regulatory filings, mapping, certified plats, procurement, non-environmental permitting, contractor bid evaluation, project management, construction inspection, and construction management. This project was designed to loop approximately 50 miles of existing North Louisiana assets and to construct approximately 80 miles of a 30” header to connect multiple interstate and intrastate pipelines to transport north Louisiana production to market, and a 10,000 HP mainline compressor station.
- Tennessee Gas Pipeline
- Tennessee Gas Pipeline Company-‐ West-‐East Pipeline Project
- UniversalPegasus performed project management, field survey, right-‐of-‐way, and mapping services for the 223 mile, 36” West-‐East Pipeline Project in Louisiana and Mississippi. Survey and mapping work included preliminary alignment, right-‐of-‐way requirements, environmental/archaeological provisions and exhibits, and construction planning. Services were coordinated from a field office in Vicksburg, Mississippi.
- Bison Pipeline Project
- UniversalPegasus provided as-‐built survey, mapping, construction management and inspection services for 303 miles of 30” natural gas pipeline in Wyoming, Montana, and North Dakota. The project was completed in 2011.
- TransWestern Gas Pipeline
- Transwestern Pipeline Company -‐ Phoenix Lateral Project
- UniversalPegasus provided detailed design of 63 miles of 42” pipeline, and construction management, inspection, materials handling, and survey services for 270-‐miles of 42” products pipeline in New Mexico and Arizona. The project was completed in 2009.
- TransWestern Gas Pipeline
- Transwestern Pipeline Company – Red Rock Expansion
- UniversalPegasus provided construction management, as-‐built survey, and inspection services for 150 miles of 30” and 36” gas transmission pipeline from Gallup to Farmington, New Mexico and 25 miles of 36” gas pipeline from Topak, Arizona to Needles, California which included three major river crossings.
- Tuscarora Gas Transmission Company Pipeline
- Tuscarora Pipeline Ltd. – Tuscarora Gas Transmission Project
- UniversalPegasus provided engineering design, preliminary survey, mapping, material procurement, and inspection services for 230 miles of 20” natural gas pipeline, launcher/receiver, measurement, and SCADA facilities in Nevada and California. Approximately 150-‐miles of this project were conducted utilizing UniversalPegasus’’s state of the art GPS technology and equipment without any conventional survey methods.
- Williams -‐ Sunstone Pipeline Project
- UniversalPegasus provided Survey, GIS/GPS, Project Management, Feasibility Study, Consulting Engineering, FEED, & FERC for 600 miles of 42” (and variations for 30” and 36”) natural gas pipeline from Opal, WY to Stanfield, OR and two compressor stations, all in support of a FERC filing application.