Tuna Gas Field

Related Pages

Egypt Oil & Gas Fields

ENI Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: ENI
  • Country: Egypt
  • Location: Temsah Concession, Offshore
  • Production start: 2010
  • Partners: BG Group
  • Type: Gas
  • Estimated Reserves:
  • Production Volume: 4.5 million scm/day of gas

Description

  • The project consists of a 4 leg platform in approximately 80 meters of water, three producing wells and 14 Km of 24" pipeline connecting to existing infrastructure.

Contractors

  • Enppi, Technomare and Petrojet: Detailed engineering, procurement services for subsea pipeline and material supply of topside facilities
  • Micoperi: Tuna platform transportation and installation
  • Seaway Heavy Lifting: Tuna Jacket and Foundation Piles
  • FoundOcean: Grouting

History

  • 2010 - First gas produced

Geology

Links

  1. Micoperi Offshore And Platform References
  2. Seaway Heavy Lifting Oil And Gas References
  3. Enppi Offshore Platform References
  4. FoundOcean Subsea References
  5. Eni starts up offshore gas production from the Tuna field in Egypt

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License