- Ujung Pangkah Oil And Gas Field
- Indonesia
- Hess
- EPC of Onshore oil Treating and LPG Recovery Plant
- 130 MMSCFD
- 105.4 million
- E,P,C
- Ujung Pangkah Oil And Gas Field
- Indonesia
- Hess
- EPC of Oil Storage Tank
- 170,000 BBL each
- 14.49 million
- E,P,C
- Flexible Program Management 400,000 BOPD Caltex Pacific Indonesia 463 million E, PM, CS, P
- FEED service for Gas Expansion Phase II Development 120 MSCFD of Gas 30,000 BOPD of Crude oil Kodeco Energy Co. Ltd. 543,564 E
- Engineering & Construction 700,000 BOPD Caltex Pacific Indonesia 686 million E,PM, CS
- Duri Oil Field
- Duri Steamflood Project Area‐11
- 100,000 BOPD
- Caltex Pacific Indonesia
- 50 million
- E, P, C
- Area‐10 Automated Well Test /Degassing 100,000 BOPD Caltex Pacific Indonesia 350,000 E
- Melibur Infill 25,000 BOPD Lasmo Oil 867,900 E, P, C
- Selatan Oil & Gas Field Development Project 45,000 BOPD Lasmo Oil (Malacca Strait) Ltd. 17 million E, P, C
- Exor I ARHDM Refinery 60,000 BOPD Pertamina 3.5 million E
- South East Sumatra PSC Oil And Gas Fields
- Indonesia
- Maxus
- Intan Widuri
- 300,000 BOPD
- 500,000
- E
- Residue Catalytic Cracking ‐ Utility 60,000 BOPD CNT / TEC 500,000 E
- Kurau Field Development Project 80,000 BOPD Hubday Oil 1.5 million E, PM, CS
- Rantau Secondary Recovery Project 30,000 BOPD Pertamina 2 million E, PM, CS
- Teluk Kabung 35,000 BOPD Pertamina 300.000 E
- Ramba Field 50,000 BOPD Asamera 3.5 million E
- Linda Field Development Project 15,000 BOPD Pertamina 24 million E, PM
- Jati Barang Substation Project 5,000 BOPD Pertamina 5 million E, PM, CS
- Salawati Development Project 60,000 BOPD Phillips Petro. 8.2 million E, PM, CS
- Kasim Marine Terminal Project 150,000 BOPD Petromer Trend 2 million E, PM, CS
- Jambi Merang Gas And Condensate Field
- Indonesia
- Pertamina‐Hess
- EPC Gas Production Facilities for Jambi Merang Development
- 120 BBTUD = 113 MMSCFD
- 154.4 million
- EPC
- Ujung Pangkah Oil And Gas Field
- Indonesia
- Hess
- EPC of Onshore oil Treating and LPG Recovery Plant
- 130 MMSCFD Sales Gas
- 21,000 BPD Crude Oil
- 600 TPD Mix LPG
- 105.4 million
- E,P,C
- Project Management Consultancy for Offshore Gas Transmission Pipeline 32”OD, 159 km pipeline PT PGN (Persero) USD380,370 + IDR53 billion E, PM, CS
- FEED service for Gas Expansion Phase II Development 120 MSCFD of Gas 30,000 BOPD of Crude oil Kodeco Energy Co. Ltd. 543,564 E
- FEED service for Gas Booster Compression 100 MMSCFD Kodeco Energy Co. Ltd. 680,152 E
- KRA South Gas Development Subsea Tie‐In Project Star Energy 12.3 million E, P, C
- South Jambi “B” Shallow Gas Project 20 MMSCFD ConocoPhillips 35 million E, P, C
- Phase “B” Field Development Project 150 MMSCFD Mobil Phase Inc. 16 million E, P, C
- NSO “A” Field Development Project 450 MMSCFD Mobil Exploration 316 million E, P, C
- Gas Transmission and Distribution Project 1004.5 km of 28” dia pipeline to transfer 670 MMSCFD
natural gas PT PGN (Persero) USD15.1 million IDR107.2 billion E, PM, C, P
- SLS “A” & “D” Field Development 550 MMSCFD Mobil Oil Indonesia 35 million E, P, C, I
- Arun LNG Terminal
- Arun Booster Compression Project
- 3,600 MMSCFD
- Mobil Exploration
- 354 million
- E, P, C
- Badak Gas and Condensate Field
- Badak Gas Field Project
- 600 MMSCFD
- HUFFCO
- 2.5 million
- E, CS
- Musi Block Project 40 MMSCFD Pertamina 8 million E, P, C
- L‐Parigi Expansion Project 180 MMSCFD Pertamina 0.4 million E, PM, CS
- Badak‐Bontang Gas Pipeline 2,310 MMSCFD Pertamina 1.8 million E,P,CM
- Pagerungan Gas Field
- Arco Bali
- 450 MMSCFD
- 9.5 million
- FEED, CS
- South Sumatra LPG 460,000 T/Y C3 + C4 S. Ferro ‐ CD
- Kakap KH Gas Conditioning 20 MMSCFD Marathon ‐ CD
- LPG Extraction 72,000 BPD C3 6,200 BPD C4 Condensate PT. Arun / JGC 1 million E
- Jati Barang Gas Project 5,000 BOPD Pertamina 5 million E, P, C
- LPG Recovery Project 150 MMSCFD IIAPCO 2.5 million FEED
- Salawati Development Project 60,000 BOPD PHILIP Petro. 8.2 million E, PM, CS
- FEED Gas to Pupuk Kaltim 60 MMSCFD Pertamina 300.000 E
- South Sumatra Gas 60 MMSCFD Pertamina 7.3 million E, CS
- Betung Gas 60 MMSCFD Pertamina 300.000 E
- Cilamaya Gas 80 MMSCFD Pertamina 400.000 E, PM, C
- LPG Filling Plant 54,000 T/Y Pertamina 300.000 E