Touat Oil Field

Summary Information

  • Operator: Sonatrach
  • Country: Algeria
  • Location: 1500km South West of Algiers
  • Production start: Expected 2016
  • Partners: GDF Suez
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume: Design Capacity - 12,500 barrels per day


  • The development includes
    • a network of 30 production gathering flow-lines,
    • two field production facilities at Hassi Illatou and Oued Tourhar,
    • two oil and gas trunklines from the FPF’s to the central production facility
    • a 81km crude oil export pipeline to transport the stabilised crude oil to the Soralchin Refinery, near Adra


  • Tеcnicas Reunidas: Gas production and processing facilities


  • 2002 - GDF SUEZ signed a production sharing contract with Sonatrach for the Touat region
  • 2013 - Tеcnicas Reunidas awarded EPC contract



  1. Mott MacDonald, TOUAT Oilfield
  2. Tеcnicas Reunidas gets a one thousand million dollars contract in Algeria

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License