Tortue Ahmeyim Oil And Gas Field
Related Pages
Mauritania Oil & Gas Fields
BP Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: BP
- Country: Mauritania / Senegal
- Location:
- Production start:
- Partners: BP, Kosmos
- Type: Oil & Gas
- Estimated Reserves: 20 TCF of gas
- Production Volume:
Description
- The initial phase of the Greater Tortue Ahmeyim project will produce gas from an ultra-deepwater subsea system comprising of four wells, and a mid-water floating production, storage and offloading (FPSO) vessel, which will process the gas, removing heavier hydrocarbon components. The gas will then be transferred to a floating liquefied natural gas (FLNG) facility, Tortue Ahmeyim FLNG Project at a nearshore hub located on the Mauritania and Senegal maritime border.
- The project involves a sharing of resources between Senegal and Mauritania
- The Tortue, Ahmeyim and Guembeul gas fields make up the development
Contractors
- TechnipFMC: FEED for the FPSO
- KBRFront End Engineering Design (FEED) contract for Phase 1
- McDermott: FEED for the subsea umbilicals, risers and flowlines (SURF) scope for the project
- BHGE: FEED for the subsea production system (SPS) scope
History
- 2015 - Tortue field discovered
- 2016 - Ahmeyim and Guembeul gas discoveries made
- 2016 - BP aquires a majority stake from Kosmos
- 2018 - TechnipFMC awarded FPSO project
- 2018 - KBR awarded FEED
- 2018 - Final investment decision reached
Geology
Links
- Kosmos Energy Makes Significant Gas Discovery Offshore Mauritania
- Kosmos Energy Announces Successful Appraisal of Gas Discovery Offshore Mauritania and Senegal
- Kosmos Energy and BP Announce Partnership in Mauritania and Senegal
- BP selects McDermott and BHGE for subsea contracts for West African Tortue/Ahmeyim Development
- TechnipFMC awarded contract for Tortue/Ahmeyim Development FPSO
- KBR Awarded FEED Contract for BP’s Tortue Project
- BP announces Final Investment Decision for Phase 1 of the Greater Tortue Ahmeyim LNG Development
page revision: 7, last edited: 03 Jan 2019 07:17