Tianjin Timeast Offshore Engineering Platform References
rating: 0+x

Related Pages

Engineering News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/engineering\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

Engineering Blog Entries


Jacket, Platform Fabrication and Installation

  1. Jinzhou 9-3 Oil Field
    • Riser Prefabrication and Installation of Submarine Pipeline
    • CNOOC
  2. Riser and Jacket Installation of 3# Island Submarine Pipeline Project
  3. Jidong Nanpu Oil Field
    • Jacket Fabrication and Installation 1-2# Island Submarine Pipeline
    • Petrochina
  4. Jacket Fabrication and Installation of Dagang Guanjiapu Oil Field Submarine Pipeline Project
  5. Liaohe Oil Field
    • Riser and Jacket Installation
    • 8 Kuai Submarine Pipeline Laying Project

Offshore Lifting and Facilities Installation achievement

  1. Suizhong 36-1 Oil Field
    • SZ36-1 Transformer Lifting Project

E/I Installation and Commissioning achievement

CFD1-1FPSO Cable Laying of Communication System, Equipment Installation and Commissioning of Top Module 2004.12-2005.7
COOEC

3 75000T-3# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2005.10-2006.2
DSIC

4 FPSO300000t/year FPSO I/E Design, Installation and Commissioning 2005.11-2007.5
CONCCO PHILLPS

5 75000T-6# Oil Tanker Living Quarter I/E Construction, Equipment Installation, Cable Laying and System Commissioning. 2006.3-2006.6
DSIC

6 Wenchang FPSO Cable Laying of Communication System, Equipment Installation and Commissioning 2006.11-2007.10
CONCCO PHILLPS


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License