Tecna Oil And Gas Processing References
Table of Contents
|
Related Pages
Engineering News
Engineering Blog Entries
Most Recently Updated Pages
Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
UPSTREAM ON-SHORE
Gas Processing
Gathering and primary separation / Dehydration
- Carina And Aries Gas Fields - Onshore Production Facilities
- Total
- Gas Dehydration Unit - Yela
- Camisea Gas Field - GasCluster - Cashiriari 3
- Summary: Gas Processing Capacity: 450 MMSCFD
- Schedule: August 2008 – July 2009
- Scope: Engineering, Procurement, Fabrication, Hazop, Precommissioning / Commissioning
- Kinteroni Gas Field - Facilities
- Repsol
- Summary: Gas Processing Capacity: 180 MMSCFD, Gas Wells: 3, Gas Wells Pressure: 3400 PSI, Flowline length/dia.: 14,5Km/16”
- Schedule: September 2011
- Scope: Engineering, Procurement, Fabrication, Construction, Hazop, Precommissioning/Commissioning, Start up assistance
Contaminants removal / Dew point control
- Contaminants Removal Unit - María Inés
- Contaminants Removal Unit - Sábalo Gas Plant
- Gas Sweetening Plant - Coronel Cornejo
- Gas Sweetening Plant - Loma La Lata
- Gas Sweetening Plant - Reggane Azrafil Project
- Gas Treatment Plant - Barda Las Vegas
- Gas Treatment Plant - Barda Las Vegas & Cóndor
- Gas Treatment Plant - Cacimbas
- Gas Treatment Plant - Copa Macoya
- Itau Gas Field - Gas Treatment Plant
- Petrobras
- Summary: Inlet contaminant Levels: 3000 PPM, Outlet contaminant Levels: 200 PPM, Liquids Processing Capacity: 1100 m3/d
- Schedule: April 2005 – June 2006 (15 months)
- Scope: Engineering, Procurement, Construction, Precommissioning & Commissioning, Start Up Assistance, O&M Assistance
- Gas Treatment Plant - Loma La Lata
- Gas Treatment Plant - 5° Tren Loma La Lata
- Gas Treatment Plant - Sierra Barrosa
- Gas Treatment Plant - Petrozuata
- Gas Treatment Plant - Sábalo
- Gas Treatment Plant - San Pedrito
- Gas Treatment Plant - San Roque
- Gas Treatment Plant - Sirari Field
- Gas Treatment Plant - Víbora Field
- Yucal Placer Gas Field - Gas Treatment Plant
- Total
- Summary: Gas Processing Capacity: 100 MMSCFD ( 2.8 MMSCMD)
- Scope: Glycol Dehydration Unit
- Gas Treatment Plant - Zorro II
- Gas Treatment Plant - Zorro III
- O&M - Gas Treatment Plant - Sábalo
- O&M - Gas Compression Plant - Villamontes
LPG recovery, storage and transport / NLG production, fractionation ans storage
- LPG Recovery Plant - Agua del Cajón
- LPG Recovery Plant - El Portón
- LPG Recovery Plant - Filo Morado
- LPG Recovery Plant - Gassi Touil Complex
- NGL Fractionation Plant - Camisea Project - EPC2
- NGL Recovery Plant - Camisea Expansion Project
- NGL Recovery Plant - Camisea Project - EPC1
- NGL Recovery Plant - Camisea Project - EPC21
- Preliminary Economics LPG Plant Study
- Redevelopment Study for Rhourde Yacoub Field
- RedevAndStudyForRhourdeYacoubField
Compression
- CompressionPlant - CasaDePiedra
- Gas Compression Plant - Aguada Pichana Debottlenecking
- Gas Compression Plant - Capao Bonito
- Gas Compression Plant - La Vertiente
- Ramos Gas Field
- Argentina
- Gas Compression Plant - PCC1
- Gas Compression Plant - PCC2
- Gas Compression Plant - PCN
- Gas Compression Plant - Río Grande
- Gas Compression Plant - Villamontes
- Gas Compression Plants - Jagua del Pilar, Curumaní, San Alberto and Puente Guillermo
- Gas Compression Plants - Juaruna & Coari
- Gas Pipeline - Chumbicha
- LP Compression Facilities - Aguada San Roque
- MP Compressor Capacity Replacement - Cañadón Alfa
Oil and water treatment
- Field Development - Palo Marcado
- Heavy Crude Oils And Natural Gas Treatment Plant - La Porfiada
- Heavy Oil Transport Prefactibility Study
- Oil Production Facilities Expansion - Block 16
- Pointe A Pierre Refinery
- Trinidad
- Waste Water Treatment Plant
- Cerro Dragón Oil Field
- Argentina
- Summary: Water Treatment Plants
- Schedule: December 2003 / December 2004
- Scope: EPCm contract, Conceptual, basic & detail engineering, Procurement and construction management, Start up
UPSTREAM OFF-SHORE
- Mexilhao Gas Field
- Brazil
- Petrobras
- Summary: Gas and Condensate Dehydration Unit - Gas Processing Capacity: 15 MMSCMD (530 MMSCFD), Condensate Processing Capacity: 3,200 m3/d (20,093 bpd)
- Scope: Basic Engineering, Mechanical Detailed Engineering, Procurement Management, Fabrication & Commissioning Assistance
- Schedule: January 2007 – March 2008 (15 months)
- P 58 FPSO
- Brazil
- Petrobras
- Gas Dehydration Unit
- P 62 FPSO
- Brazil
- Petrobras
- Gas Dehydration Unit
- Gas Dehydration Unit - P34 OffShore Platform
- Landulpho Alves Rlam Refinery
- Brazil
- Petrobras
- Hydrotreating Furnaces
- PH1 Furnace - La Libertad Refinery
- Albacora Leste P 50 FPSO
- Brazil
- Petrobras
- Gas & Water Re-injection
Links
page revision: 13, last edited: 24 Jul 2014 11:14