Taurt Gas Field
Related Pages
Egypt Oil & Gas Fields
BP Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: BP
- Country: Egypt
- Location: Ras El Barr (REB) concession
- Production start: 2008
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- Taurt is part of the Ras El Barr Concession Oil And Gas Fields
- The Taurt project is an offshore development with a Subsea Production System (SPS), two subsea wells, and a 70 kilometre pipeline and control umbilical back to upgraded facilities at the existing West Harbor Gas Processing Plant
Contractors
- Genesis: Engineering and project support,
- ENPPI: Onshore modifications design, Petrojet for the onshore modification and subsea structure construction,
- PMS and Allseas: Offshore pipeline installation,
- Cameron: SPS supply,
- Aker Solutions: Umbilical supply,
- Sonsub: Offshore construction,
- Five Ocean Services: Umbilical installation
- Universalpegasus: Technical support, expediting, procurement and project management services
History
- 2004 - Taurt Gas Field discovered
- 2008 - First gas produced
Geology
Links
- Universalpegasus Subsea References
- Aker Solutions Umbilical References
- Serimax Africa Pipeline References
- BP Egypt Announces Taurt Discovery In Eastern Nile Delta
- BP Starts Production from Taurt
page revision: 10, last edited: 19 Jul 2015 12:27