Surmont Oil Sands Project

Related Pages

Canada Oil & Gas Fields

Conoco Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Conoco
  • Country: Canada
  • Location: 60 kilometers southeast of Fort McMurray in Alberta
  • Production start:
  • Partners: Conoco - 50%, Total - 50%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: 26,000

Description

  • A Steam Assisted Gravity Drainage project

Contractors

Surmont Phase 2

  • Bantrel:
    • Front-end engineering activities (FEL-3)
    • Engineering Procurement & Construction
  • Aker Solutions:
    • Slop Oil Treater Package
    • 2 FWKO Vessels c/w insulation; platform; sample box; sample tubing & sample cooler - 13 ID x 60
    • 2 Treater Vessels c/w insulation; platform; sample tubing; sample cooler & sample box 13 ID x 80

History

  • 1997 - The initial Surmont pilot project began
  • 2003 - The joint venture decided to launch the first phase of commercial development
  • 2005 - Total increased its stake to 50%
  • 2007 - Surmont Project Enters Commercial Production
  • 2008 - Bantrel was awarded front-end engineering activities (FEL-3) for Surmont Phase 2
  • 2010 - Bantrel was awarded the EPC phase for Surmont Phase 2

Geology

Links

  1. Aker Solutions Oil And Gas Processing References
  2. IMV Projects Awarded Surmont Development Study by ConocoPhillips Canada
  3. Canada : Total increases its share in the Surmont oil sands leases to 50 %
  4. Surmont Project Enters Commercial Production
  5. ConocoPhillips Surmont Phase 2 Project, Bantrell

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License