Stp Mckay Oil Sands Project
Related Pages
Canada Oil & Gas Fields
Southern Pacific Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Southern Pacific
- Country: Canada
- Location: Fort McMurray, Alberta
- Production start: 2012
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: The design capacity of Phase 1 is 18,000 bbl/d of bitumen
Description
- STP-McKay is located about 45 km (28 miles) northwest of Fort McMurray, Alta. Phase 1 is designed to recover 12,000 bbl/d of bitumen.
- The facility uses Steam Assisted Gravity Drainage SAGD
- 24 well bores make up 12 SAGD well pairs, drilled from two pads
- Southern Pacific will be transporting the bitumen by rail to the gulf coast
- STP-McKay Phase 2 would increase Southern Pacific’s operations in the area from the Phase 1 capacity of 12,000 bbl/d to a total design capacity of 36,000 bbl/d of bitumen
Contractors
- Precision Drilling: Contract drilling
History
- 2011 - Southern Pacific Submits Phase 2 Expansion Application
- 2012 - Contracts signed for transporting the bitumen by rail to the gulf coast
- 2012 - Southern Pacific Sells First Barrels Of Bitumen From STP-Mckay Thermal Project
Geology
Links
- Southern Pacific Sells First Barrels Of Bitumen From STP-Mckay Thermal Project
- Southern Pacific Provides STP-McKay Operations Update
- Southern Pacific Completes Project Start-Up With Steam To Second Well Pad At Mckay
- Southern Pacific Resource Corp. Completes Arrangements To Transport And Market Bitumen Via CN To The U.S. Gulf Coast
- Southern Pacific Submits Stp-Mckay Phase 2 Expansion Application To Increase Total Project Production Capacity To 36,000 Bbl/D
- Southern Pacific Completes SAGD Drilling at STP-McKay Thermal Project and Reduces Estimate of Total Project Capital Cost
- Southern Pacific Completes SAGD Drilling at STP-McKay Thermal Project and Reduces Estimate of Total Project Capital Cost
page revision: 10, last edited: 17 Nov 2014 11:59