South Tunisia Gas Project Stgp

Related Pages

Gas Pipelines in Africa

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source:
  • Destination: Gabes town located in Southeastern Tunisia
  • Ownership: ETAP, OMV, ENI
  • Website:
  • Length: 320 kilometres ( miles)
  • Capacity: 4.4 Millions S m3/day
  • Status: Planned

Details

  • Gas is to be supplied by the Nawara Oil And Gas Fields
  • A 320km pipeline of 28” that will transport raw gas from the south to a gas treatment plant (GTP) is to be built near Gabes town located in Southeastern Tunisia .
  • Initial treatment capacity is 4.4 Millions S m3/day, (about 155 MMCFGPD); the pipeline could reach the capacity up to 10 Millions S m3 /day, (about 350 MMCFGPD)

Contractors

  • ABB: Turnkey delivery of the Nawara gas treatment plant (GTP) including gas separation and Liquefied Petroleum Gas (LPG) extraction units. It will also provide key automation, communications and power components, including the control system and transformers and switchgear for the electrification of the plant

History

  • 2014 - Final investment decision taken

Other Information

  • -

Links

  1. ETAP’s Mohamed Akrout: More Than Twenty Open Blocks in Tunisia Available for Potential Investors
  2. OMV invests EUR 500 mn in Tunisia in a project together with ETAP
  3. ABB to build $216 million gas treatment plant in Tunisia

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License