South Angsi Oil Field

Related Pages

Malaysia Oil & Gas Fields

Talisman Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Talisman
  • Country: Malaysia
  • Location: Block PM-305 offshore
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • Subsea 7: Installation of the mooring system for a floating storage offloading unit (FSO) consisting of twelve piles for the FSO and two piles for a shuttle tanker
  • MMHE: Platform A construction
  • MMCOG: Detailed Design for Angsi Facilities Upgrading Project - Booster Compression Module
  • Process Group: Angsi A platform - Sand Handling and Removal Package

History

  • 2005 - Subsea 7 awarded mooring system contract
  • 2005 - Talisman Announces First Oil Production

Geology

Links

  1. Jotun Platform References
  2. MMCOG Platform References
  3. Misc FPSOs And Platforms
  4. Process Group Oil And Gas Processing References
  5. MISC Secured Another FSO Contract
  6. Contract for Subsea 7 in Malaysia
  7. Talisman Announces First Oil Production From South Angsi Field in Malaysia

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License