Related Pages
Engineering News
Engineering Blog Entries
Most Recently Updated Pages
Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
Turn Key
- Sannazzaro De Burgondi Refinery
- Italy
- ENI S.p.a Div. R&M
- New Vacum Column & Automatic Filtration System on the existing FCC Plant
- 11.000.000
- 2011 -in progress
- Taranto Refinery
- Italy
- ENI S.p.a Div. R&M
- Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
- 1.100.000
- 2010
- Sannazzaro De Burgondi Refinery
- Italy
- ENI S.p.a Div. R&M
- C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
- 8.500.000
- 2008-2009
POLIMERI EUROPA
W.W.T. Covering System and Hydrocarbon
Separation Unit by Cryogenic Condensation
System in Sarroch Petrochemical Complex
6.000.000 2007-2008
- Milazzo Refinery
- Italy
- ENI S.p.a Div. R&M
- Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
- 2.800.000
- 2007
- Milazzo Refinery
- Italy
- ENI S.p.a Div. R&M
- Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
- 3.000.000
- 2005
RAFFINERIA DI GELA New Instrumentation System (DCS) for Waste
Water Treatment Unit of the Gela Refinery 1.400.000 2004
AGIP GAS
Railway Loading Arms extension for GPL
storage and supply of underground tanks for
the Livorno Storage Facilities
3.800.000 2000
Engineering
- Milazzo Refinery
- Italy
- ENI S.p.a Div. R&M
- KEROSENE DESULPHURIZATION UNIT
- Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
- 10.000
- 2013
TREATED
DEASPHALTED
AROMATIC EXTRACT
Extended Basic Design Package for a New
TDAE Unit / ENI R&M Div., Livorno Refinery
(Italy)
10.000 2013
W.W.T. for Water
Re-use
Multidiscipline Engineering Design for a New
Waste Water Treatment Package / ENI S.p.A.
Div. R&M
18,000 2011-2012
OFFSHORE
PLATFORMS
Front End Engineering Design for n° 3 new
gas platforms located offshore Adriatic Sea
(Italy) and the relevant +/- 15% Cost Estimate
/ENI S.p.a E&P Div.
50.000 2010-2011
COMBINED HEAT &
POWER PLANT
Front End Engineering Design, +/- 15% Cost
Estimate and preparation of EPC Tender
Documents for Power Plant Revamping
located in Bolgiano, San Donato Milanese
(Italy) / ENIPOWER.
18.000 2010
RESIDUE
HYDROCRACKER
Multidiscipline Engineering Design of EST
Project- ENI R&M Div. in Sannazzaro Refinery
in Italy / SAIPEM S.p.A.
220.000 2009-2012
AMMONIA PLANT/
UTILITY UNITS
Multidiscipline Engineering Design of
QAFCO5 Project in Qatar/SAIPEM S.p.A. 170.000 2008
OFFSHORE AND
MARINE TERMINALS
Conceptual Design, Basic Design & FEED
for Trans-anatolian Pipeline , Samsun and
Cehyan Marine Terminal Oil Storage
Facilities in Turkey/ SNAMPROGETTI S.p.A.
90.000 2006-2007
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
- Elephant Oil Field
- Libya
- ENI Oil Co. Ltd
- Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC of the Elephant Oil Field at the Murzuk Basin
- 25.000
- 2005
HYDROFINISHING
UNIT & OFFSITE
REVAMPING
Multidisciplinary Engineering Design of the
Lubricants Re-refining Plant -Lodi (Italy)/
VISCOLUBE S.p.A.
50.000 2003