Shelley Oil Field
Related Pages
UK Oil & Gas Fields
Premier Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Premier
- Country: UK
- Location: central North Sea
- Production start: 2009
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The field has been developed using two horizontal subsea production wells equipped with downhole electric submersible pumps.
- The wells are connected via a short flowline, and a control umbilical, to the Sevan Voyageur FPSO
Contractors
- Sevan Marine: Supply of FPSO
- Technip: Engineering, installation and commissioning of pipelines, a control umbilical and jumpers(3), flexible risers(4), a subsea manifold and attendant flowline(5).
History
- 1984 - The Shelley field was discovered
- 2008 - Project development approved by UK Government
- 2009 - First oil produced
- 2010 - Decommissioning approved
Geology
Links
- UK Oil And Gas Field Approved Decommissioning Programmes
- Technip awarded frame agreement for UK North Sea field developments
- Shelley first oil
page revision: 6, last edited: 25 Apr 2014 07:33