Sekco Oil Pipeline

Related Pages

USA Oil Pipelines

Enterprise Oil Pipelines

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

Brief Description

  • The 149-mile, 18-inch diameter SEKCO Oil Pipeline is being designed with a capacity of 115,000 barrels per day (“BPD”) and would connect the Lucius Oil Field-truss spar floating production platform to an existing junction platform at South Marsh Island 205 that is part of the Enterprise-operated Poseidon Oil Pipeline system.

Pipeline Status

  • In operation

History

  • 2012 - Enterprise and Genesis Energy agree to build Sekco Oil Pipeline
  • 2014 - Pipeline completed

Other Information

  • -

Links

  1. Enterprise and Genesis Energy to Build Crude Oil Gathering Pipeline in the Deepwater Gulf of Mexico
  2. Enterprise and Genesis Complete Crude Oil Pipeline in the Deepwater Gulf of Mexico

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License