Schiehallion FPSO
Related Pages
UK FPSOs
BP FPSOs
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Name: Schiehallion FPSO
- Field: Schiehallion Oil Field
- Country: UK
- Ownership: BP
- Website:
- Field Operated By: BP
- Capacity: 130,000 bpd
- Year of Completion: 1997
Brief Description
- The Schiehallion FPSO incorporates two trains of oil separation and high-pressure gas compression.
- The vessel has storage for 950,000 barrels of oil
- The oil can be off-loaded on to shuttle tankers at the rate of 600,000 barrels per 24-hour period
- The vessel is permanently moored by means of a forward top mounted internal turret system, which holds the FPSO on station during survival storm conditions. Fourteen mooring chains anchor the vessel in approximately 400 meters of water.
- The vessel was decommissioned as part of the Quad 204 Redevelopment Project, which is designed to extend the lives of the Schiehallion & Loyal fields utilising the Glen Lyon FPSO
- The vessel has been refurbished and renamed Armada Intrepid FPSO
Contractors
- Brown & Root: Project management, the design and fabrication of the FPSO's topsides and for the vessel installation
- Harland and Wolff: Design and build the 950,000 barrel capacity vessel
- SBM: Design and build the turret and moorings
- Brown & Root McDermott Fabricators (BARMAC): Fabrication of 6,300 tonnes of process topsides
- BiFab:
- Fabrication of Upper Turret for FPSO Including Duplex Process Pipework and the LQ Module
- Hex Replacement Module
- Extended Living Quarter
- HSM Offshore: Compression Modules
Status
- In operation
History
- 1997 - Schiehallion FPSO completed
- 2013 - The FPSO is decommissioned and sold
Other Information
- -
Links
- Gustomsc FPSO References
- BiFab Platform References
- HSM Offshore Platform References
- GE Announces Start-Up Of Two LM6000 Gas Turbines On Schiehallion FPSO
- Schiehallion Oilfield Development Sanctioned
- Alliance starts on BP'S 400 million British pound Schiehallion project
- Oil Production Starts from Schiehallion Field
- BP chooses Aibel’s VIEC technology for Schiehallion FPSO
page revision: 14, last edited: 21 Aug 2015 08:49