Savonette Gas Field
Related Pages
Trinidad And Tobago Oil & Gas Fields
BP Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: BP
- Country: Trinidad And Tobago
- Location: Columbus basin
- Production start: 2009
- Partners:
- Type: Gas
- Estimated Reserves: 2tcf
- Production Volume:
Description
- The platform is a normally unmanned installations operated remotely and only requires occasional day visits for maintenance
- Production ties into bpTT’s Mahogany B platform via a subsea pipeline, where it is processed and transported through existing pipelines to shore and then on for further processing at facilities on the western side of the island of Trinidad
Contractors
- TOFCO: Construction of platform Deck and Jacket & Subsea Spool Fabrication
- Bibby Offshore: Offshore construction
History
- 2004 - The Savonette field was discovered
- 2009 - First gas production
- 2012 - Reserves were revised to 2 tcf after Savonette 4 was drilled
Geology
Links
- Bibby Offshore Subsea References
- Tofco Platform References
- New gas flowing from Trinidad
- BP Makes Trinidad Gas Discovery
page revision: 11, last edited: 24 Aug 2014 19:32