Satah Al Razboot Sarb Oil Field

Related Pages

UAE Oil & Gas Fields

ADMA-OPCO Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: ADMA-OPCO
  • Country: UAE
  • Location: 120 kilometres to the northwest of Abu Dhabi
  • Production start: 2016 - Expected
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
  • Drilling will be conducted from two artificial islands (SARB1 and SARB2) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.

Contractors

  • Fluor: Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
  • Petrofac:
    • 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.
    • The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.
    • The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
  • JDR: design and manufacture of five subsea power and communication (composite) cables and associated accessories

History

  • 2010 - Fluor Wins FEED Contract for full field development
  • 2013 - Petrofac awarded major subsea project

Geology

Links

  1. Bluewater Calm Buoy Mooring References
  2. Fluor Wins Offshore FEED Contract in Abu Dhabi
  3. Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi
  4. Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License