SapuraKencana Platform References
- Tapis Oil Field
- ExxonMobil
- PC-Fabrication of Tapis-R Jacket, Procurement, Fabrication,Testing, Loadout and Tie-Down of Tapis-R Jacket, Piles and Appurtenances
- 2011-2013
- Sarawak Oil Project
- Murphy
- EPC of Patricia Satellite for SK309/311 Sarawak Development Project
- 2011-2012
- Cendor Oil Field
- Petronas
- Provision of Engineering Procurement and Construction (EPC) of Wellhead Platforms (CDW-B and CDW-C) for Cendor Phase 2 Development Project Block PM-304
- 2011-2012
- Kebabangan Oil Field
- Conocophillips
- Fabrication of KBB Substructure
- Engineering, procurement, fabrication, inspection, testing and pre-commissoning, loadout and seafastening of the KBB Substructure - 8 legged Jacket for Kebabangan Northern Hub Development Project
- 2011-2013
- Tangga Barat Cluster Gas And Condensate Fields
- Petronas Carigali Sdn Bhd
- PCSB - Tangga Barat Cluster Development Project (Phase 1)
- 1 August 2010
- KM-1 - Self Erected Tender Rig and Derrick Equipment Set
- Kencana Mermaid Drilling Sdn Bhd
- Self Erected Tender Rig and Derrick Equipment Set
- 1 August 2010
- Cili Padi Gas Field
- Sarawak Shell Berhad
- Fabrication of CPDR-A Topside
- 1 April 2010
- West Belumut
- Peninsular Malaysia
- Newfield
- Provision of Procurement, Construction of Jacket & Topside for West Belumut Wellhead Platform
- 1 February 2010
- Sarawak Gas Project
- Murphy
- Realignment of 500mm Steel Pipe & Associated works
- Serampang-A (SEPA) Production of Topside Facilities for Phase 1 SK-309/311 Sarawak Gas Development Project
- 1 January 2010
page revision: 8, last edited: 20 Aug 2015 12:58