Sangu Gas Field
Related Pages
Bangladesh Oil & Gas Fields
Santos Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Santos
- Country: Bangladesh
- Location: Bay of Bengal
- Production start: 1998
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- Sangu was the first offshore gas field development in Bangladesh
- The development consists of the Sangu A wellheads platform; 50km of 20” gas pipeline and the Chilimpur Gas Terminal with capacity of 260 mmscfd
Contractors
- McDermott-ETPM: Subsea Pipelines
- Wood Group: Operations and Maintenance
History
- 1996 - The Sangu gas field was discovered
- 1998 - First gas produced
- 2000 - South extension discovered
- 2003 - Cairn acquired Shell's stake
- 2007 - Santos acquires a 37.5% interest
- 2010 - Santos acquires Cairn's stake in the field
Geology
Links
- Wood Group, Sangu
- Serimax Asia Pipeline References
- Shell Discovers Extension of Sangu Gas Field
- Acquisition of Shell’s Upstream Assets in Bangladesh
- Santos acquires interests in Bangladesh
- Santos to Acquire Cairn Energy Sangu Field Ltd
page revision: 8, last edited: 15 Jul 2015 12:29