Sangu Gas Field

Related Pages

Bangladesh Oil & Gas Fields

Santos Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Santos
  • Country: Bangladesh
  • Location: Bay of Bengal
  • Production start: 1998
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Sangu was the first offshore gas field development in Bangladesh
  • The development consists of the Sangu A wellheads platform; 50km of 20” gas pipeline and the Chilimpur Gas Terminal with capacity of 260 mmscfd

Contractors

  • McDermott-ETPM: Subsea Pipelines
  • Wood Group: Operations and Maintenance

History

  • 1996 - The Sangu gas field was discovered
  • 1998 - First gas produced
  • 2000 - South extension discovered
  • 2003 - Cairn acquired Shell's stake
  • 2007 - Santos acquires a 37.5% interest
  • 2010 - Santos acquires Cairn's stake in the field

Geology

Links

  1. Wood Group, Sangu
  2. Serimax Asia Pipeline References
  3. Shell Discovers Extension of Sangu Gas Field
  4. Acquisition of Shell’s Upstream Assets in Bangladesh
  5. Santos acquires interests in Bangladesh
  6. Santos to Acquire Cairn Energy Sangu Field Ltd

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License