Sangachal Oil And Gas Processing Terminal
rating: 0+x

Related Pages

Oil Terminals in Azerbaijan

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Ownership: BP
  • Website:
  • Location:
  • Capacity:
  • Crude Type:

Brief Description

Contractors

  • KBR: Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
  • Aker Solutions:
    • Heater Treater Upgrade
    • Engineering and subcontract fabrication of an H2S Scavenging vessel
    • 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations
    • Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration
    • Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers

Ongoing Projects

  • -

Other Information

  • -

History

  • 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2

Relevant Links

  1. Aker Solutions Oil And Gas Processing References
  2. BP, Sangachal Oil Terminal
  3. KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License