Sakhalin Ii Lng Terminal
Related Pages
LNG Terminals in Russia
Shell LNG Terminals
LNG News
For More LNG News
LNG Blog Entries
Summary Information
- Ownership: Sakhalin Energy
- Gazprom holds 50% plus 1 share, Shell 27.5%, Mitsui 12.5% and Mitsubishi 10%
- Website: http://www.sakhalinenergy.ru/
- List of Shell LNG Terminals
- Location: Sakhalin, Russia
- Capacity: 9.0 million tons/annum
- Status: In Operation
Brief Description
- The plant consists of two LNG trains, each with a production capacity of 4.8 million tonnes per year
Technical Details
- Storage capacity: two 100,000 cubic meter LNG tanks
- Constructor:
- Fluor: Contract to provide engineering services for the preparation of a project specification and TEOC documentation (Russian permitting documents)
- Chiyoda Corporation and Toyo Engineering Corporation, with their Russian partner companies, the KhimEnergo Consortium and NIPIgaspererabotka, were awarded an EPC contract
- CB&I: Construction of the storage tanks
- Freyssinet: Pre-stressing for LNG tanks
- Licensor: Shell's liquefaction process DMR (Dual Mixed Refrigerant) process is used in this project
History
- 2000 - Fluor awarded a contract to provide engineering services for the preparation of a project specification and TEOC documentation (Russian permitting documents)
- 2000 - Shell acquired Marathon's stake in the project
- 2003 - EPC contract awarded
- 2007 - Gazprom becomes a major partner
- 2007 - Osaka Gas signed the Heads of Agreement (HOA) for the purchase of LNG from Sakhalin II
- 2008 - JBIC Signs Loan Agreement for US$3.7 billion for the Project
- 2009 - Dmitry Medvedev, Russian President opened the terminal
- 2013 - Design process started for 3rd train
- 2014 - Cumulative production reached 50 million tons
- 2015 - 1000th cargo sold
Ongoing Projects/Project Status
- Commissioning was completed in 2009
- A third train is to be added to increase capacity
Suppliers / Customers
- Suppliers:
- The plant is supplied by the Piltun Astokhskoye Oil And Gas Field and the Lunskoye Oil And Gas Field
- Customers:
- Osaka Gas 200,000 tons per year
- Chubu Electric 0.5 million tonnes per annum (mtpa)
Other Information
- -
Relevant Links
- Freyssinet LNG Tank References
- Chiyoda LNG References
- Shell Sakhalin Holdings B.V. And Marathon Sakhalin Limited Asset Swap
- to Provide Project Specification and TEOC For a Multi Billion Dollar Liquefaction Plant on Sakhalin Island
- Chiyoda/TEC Consortium Awarded an EPC Contract for Sakhalin II LNG Project In Russia
- Deal with Osaka Gas: Sakhalin II LNG sold
- CB&I Wins EPC Contract For Sakhalin II LNG Storage
- Signing of HOA for Purchase of LNG from Sakhalin II Project
- Gazprom enters Sakhalin II project
- JBIC Signs Loan Agreement for Sakhalin II (Phase 2) Project
- Subartic Debut for LNG Process
- New energy source comes onstream at Sakhalin II
- Sakhalin LNG Exports reached 4.5% of global market in 2012
- Gazprom and Shell agree on moving over to design stage of project for third train of LNG plant in Sakhalin
- Gazprom and Shell sign roadmap for third train of Sakhalin II project
- 50 million tonnes of LNG produced on Sakhalin-2 project
- GM&T signs long-term time charter agreement with Sakhalin Energy
- Sakhalin Energy offloaded the 1000th LNG cargo
page revision: 4, last edited: 27 Apr 2012 07:43