Prelude Floating LNG Terminal

14737949310_3b4bde1eee_m.jpg

Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built


EPC

  1. Arzew LNG Terminal
    • SONATRACH
    • GL-3Z ARZEW (ALGERIA)
    • Capacity: 4.7 MTPA.
    • Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbine.
    • Tanks: 2 LNG x 160,000 cu.m each.
    • Product Export Jetty.
    • Contract: EPC.
    • JV Partner: Chiyoda.
    • In execution since end 2008.
  2. Rasgas LNG Terminals
    • RAS LAFFAN LNG CO. LTD.
    • RASGAS ONSHORE EXPANSION PROJECT (TRAINS 3,4,5) RAS LAFFAN (QATAR)
    • Capacity: 4.7 MTPA each train.
    • Liquefaction Technology: APCI (C3MR), GE Frame 7 gas turbines, water cooled.
    • Tanks: 2 LNG x 140,000 cu.m each.
    • Contract: EPC.
    • JV Partner: Chiyoda.
    • Completed, respectively, in 2004, 2005, 2006.
    • This project, which included the design and installation of LNG trains whose capacity ranked among the largest trains operating in the world, contributed to launch Qatar into a new era as an LNG exporter.
  3. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAINS 1&2
    • Capacity: 2.9 MTPA each train.
    • Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
    • Tanks: 2 LNG x 84,000 cu.m each.
    • Product Export Jetty.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 1999.
  4. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAIN 3
    • Capacity: 2.9 MTPA.
    • Liquefaction Technology: APCI (C3MR), GE Frame 6 & GE Frame 7 gas turbines, water cooled.
    • Tanks: 1 LNG x 84,000 cu.m.
    • Product Export Jetty.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 2003.
  5. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAINS 4&5
    • Capacity: 4 MTPA each train.
    • Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 2006.
  6. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAIN 6
    • Capacity: 4 MTPA.
    • Liquefaction Technology: Shell/APCI (C3MR), GE Frame 7 gas turbines, air cooled.
    • Tanks: 1 LNG x 84,000 cu.m.
    • Contract: FEED + EPC.
    • JV Partner: Technip, KBR, JGC. Completed in 2008.
  7. Nigeria LNG Terminal
    • NIGERIA LNG LTD.
    • LNG PRODUCTION (6 TRAINS) BONNY ISLAND (NIGERIA)
    • TRAIN 7 PLUS
    • Capacity: 8.5 MTPA.
    • Liquefaction Technology: Shell (PMR).
    • Contract: FEED.
    • JV Partner: Technip, KBR, JGC. Completed in 2007.
    • With the start-up of train 6, the Nigeria LNG complex has reached an overall capacity of 22 MTPA of LNG, which will grow to more than 30 MTPA, once the Nigeria LNG Seven Plus Project will be completed.
    • This overall investment has enabled Nigeria LNG Ltd. to become one of the top LNG producers in the world.
  8. Marsa El Brega LNG Terminal
    • ESSO STANDARD INC.
    • LNG PRODUCTION PLANT MARSA EL BREGA (LIBYA)
    • Capacity: 2.5 MTPA.
    • Liquefaction Technology: APCI (SMR).
    • Contract: For construction of the grass-roots complex.
    • Completed in 1970.

Design

  1. AZURE Project for EEC, 1.0 / 3.0 MTPA LNG train: Conceptual Design (1999).
  2. Olokola LNG Terminal
    • OK LNG
    • OLO KOLA PROCESS PLANT FEED (2 TRAINS) (NIGERIA)
    • Capacity: 2 trains x 6.3 MTPA each.
    • Liquefaction Technology: APCI (C3MR).
    • Contract: FEED and pre-EPC Services.
    • JV Partner: Technip. Completed in 2008.
  3. Pars LNG Terminal
    • PARS LNG
    • two 5 MTPA LNG trains,
    • Axens (Liquefin) Technology:
    • FEED Review and EPC Bid (All Electric Drives).
  4. Iran NIOC LNG Terminal
    • IRAN LNG
    • two 5 MTPA LNG trains
    • Linde (MFC) Technology
    • FEED Updating (All Electric Drives).
  5. IRIS LNG, four 5 MTPA LNG trains, Linde (MFC) Technology: Conceptual Design (All Electric Drives).
  6. LIBYA LNG, three 5 MTPA LNG trains, APCI (C3MR) Technology: Basic Design.
  7. LNG Plant for ENI E&P, one 5 MTPA LNG train, APCI (C3MR) Technology: Conceptual Design.

Gasification

  1. Swinoujscie Polskie Lng Terminal
    • POLSKIE LNG
    • POLSKIE LNG TERMINAL SWINOUJCIE (POLAND)
    • LNG Send Out Capacity: 3.83 MTPA.
    • Vaporizers: 5 SCVs of 250 t/h each.
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
    • Contract: EPC LSTK.
    • JV Partners: Techint, PBG SA, PBG Export. Under Execution.
    • The first LNG Terminal and LNG Tanks ever built in Poland.
  2. Fos Cavaou LNG Terminal
    • GAZ DE FRANCE/TOTAL
    • FOS CAVAOU LNG IMPORT TERMINAL FOS SUR MER, MARSEILLE (FRANCE)
    • LNG Send Out Capacity: 6.6 MTPA.
    • Vaporizers: 4 ORVs of 343 t/h each.
    • Tanks: 3 x 110,000 cu.m (9% Ni Full Containment Tanks).
    • Marine Works: LNG offloading jetty.
    • Contract: EPC LSTK.
    • JV Partner: Tecnimont Sofregaz. Under execution.
    • The biggest ORVs ever designed and built.
  3. Canaport LNG
    • REPSOL / IRVING OIL
    • CANAPORT LNG TERMINAL
    • ST.JOHN, NEW BRUNSWICK (CANADA)
    • LNG Send Out Capacity: 7.7 MTPA
    • Vaporizers: 6+1 SCVs of 126 t/h each.
    • Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks).
    • Contract: EPC LSTK.
    • JV Partner: SNC Lavalin. On stream in 2009.
    • The first LNG regasification plant ever built in Canada.
    • The schedule and construction organization had been tailored to take into account the harsh Canadian winter conditions.
  4. Freeport LNG Terminal
    • FREEPORT LNG
    • LNG IMPORT TERMINAL QUINTANA ISLAND, TEXAS (USA)
    • LNG Send Out Capacity: 11.0 MTPA.
    • Vaporizers: 7 shell + tube vaporizers water/glycol loop heated of 200 t/h each.
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks).
    • Marine Works: LNG offloading jetty.
    • Contract: EPC LSTK.
    • JV Partner: Technip Zachry. On stream in 2008.
    • The first design and installation of vacuum insulated unloading line.
    • The terminal is fully operated with shell and tubes vaporizers.
  5. Fluxys Zeebrugge LNG Terminal
    • FLUXYS LNG
    • LNG IMPORT TERMINAL
    • ZEEBRUGGE (BELGIUM)
    • LNG Send Out Capacity: 5.7 MTPA (additional capacity).
    • Vaporizers: 5 SCVs of 182 t/h each.
    • Tanks: 1 x 140,000 cu.m semi buried (9% Ni Full Containment Tank).
    • Contract: EPC LSTK.
    • Consortium Partner: MBG, Fontech Soletanche. On stream since 2008.
    • Extension of an existing terminal.
    • The project has been performed in a plant in operation.
  6. Guangdong Dapeng LNG Terminal
    • DAPENG GUANDONG LNG, LNG IMPORT TERMINAL
    • CHENGTOUJIAO, GUANGDONG PROVINCE (CHINA)
    • LNG Send Out Capacity: 4.0 MTPA.
    • Vaporizers: 5 ORVs of 180 t/h each, 1 SCV of 120 t/h.
    • Tanks: 3 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG unloading jetty with mooring facilities for 160,000 cu.m LNG carriers, dredging 1.5 MM cu.m.
    • Contract: EPC LSTK.
    • JV Partner: Tecnimont. On stream since 2006.
    • First LNG terminal ever built in the People’s Republic of China. All tanks are erected on seismic insulators.
  7. Hazira LNG Terminal
    • HAZIRA LNG IMPORT TERMINAL GUJARAT PROVINCE (INDIA)
    • LNG Send Out Capacity: 2.0 MTPA.
    • Vaporizers: 2 ORVs of 138 t/h each, 1 SCV of 138 t/h.
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment Tanks). Marine Works: Complete harbour, LNG offloading jetty for 150,000 cu.m LNG carriers, breakwaters.
    • Contract: EPC LSTK.
    • JV Partner: Tecnimont. On stream since 2005.
    • This terminal included all necessary utilities production, due to the remote location.
    • Construction of a complete harbour facility including the breakwater and the LNG unloading jetty.
  8. Bilbao LNG Terminal
    • BAHIA DE BISKAIA GAS (BBG)
    • BILBAO LNG IMPORT TERMINAL BILBAO (SPAIN)
    • LNG Send Out Capacity: 4.0 MTPA.
    • Vaporizers: 4 ORVs of 200,000 Ncu.m/h, 1 SCV of 135,000 Ncu.m/h.
    • Tanks: 2 x 150,000 cu.m (9% Ni Full Containment Tanks). Marine Works: LNG offloading jetty with mooring facilities for 135,000 cu.m LNG carriers.
    • Contract: EPC LSTK.
    • JV Partner: Initec, Tecnimont. On stream since 2003.
    • First LNG tanks hydrotest performed using sea water.
  9. Revithoussa LNG Terminal
    • DEPA
    • LNG IMPORT TERMINAL REVITHOUSSA ISLAND (GREECE)
    • LNG Send Out Capacity: 0.5 MTPA.
    • Vaporizers: 2 ORVs of 60 t/h each, 2 SCVs of 60 t/h each.
    • Marine Works: Mooring quay.
    • Contract: EPC LSTK.
    • JV Partner: Sofregaz. The JV was in consortium with Technical Union.
    • On stream since 1999.
    • First LNG terminal ever built in Greece. The terminal is located on an island.
  10. Marmara LNG Terminal
    • BOTAS
    • LNG IMPORT TERMINAL MARMARA EREGLISI (TURKEY)
    • LNG Send Out Capacity: 1.6 MTPA.
    • Vaporizers: 2 ORVs of 180 t/h, 4 SCVs of 100 t/h each.
    • Tanks: 3 x 85,000 cu.m (9% Ni Double Containment Tanks).
    • Marine Works: 300 m long LNG unloading jetty.
    • Contract: EPC LSTK.
    • Consortium Partner for Construction: STFA. On stream since 1994.
    • First LNG terminal ever built in Turkey.
  11. Pyeongtaek LNG Terminal
    • KOGAS
    • LNG IMPORT TERMINAL PYEONG TAEK (SOUTH KOREA)
    • LNG Send Out Capacity: 2.8 MTPA.
    • Vaporizers: 2 ORVs of 130 t/h each, 2 SCVs of 140 t/h each.
    • Tanks: 10 x 110,000 cu.m (Membrane LNG tanks).
    • Marine Works: LNG offloading jetty.
    • Contract: EPC LSTK.
    • On stream since 1987.
    • First LNG terminal ever built in Korea.
    • Membrane LNG tanks erected on seismic insulators.
  12. Panigaglia LNG Terminal
    • SNAM S.P.A.
    • LNG IMPORT TERMINAL PANIGAGLIA, LA SPEZIA (ITALY)
    • LNG Send Out Capacity: 2.8 MTPA.
    • Vaporizers: 4 SCVs of 110 t/h each.
    • Tanks: 2 x 50,000 cu.m (The 9 Ni tanks were transformed into double integrity type, with the addition of a pre-stressed concrete wall together with the modernization of the loading/unloading system).
    • Contract: LSTK contract for basic and detailed engineering, procurement services, erection supervision, commissioning and start-up.
    • On stream since 1971.
    • First LNG terminal ever built in Italy.
  13. Livorno LNG Terminal
    • OLT (OFFSHORE LNG TOSCANA)
    • LIVORNO FSRU
    • 20 KM OFFSHORE LIVORNO (ITALY)
    • Average natural gas Send Out: 3.2 MTPA.
    • Peak Send Out Rate: 4.0 MTPA.
    • Hull: Golar Frost LNG carrier, 301 m (with turret & thruster) x 48 m, 137,000 cu.m net LNG capacity.
    • Compacted Topsides Module: 30 m.
    • LNG Transfer System: Marinized loading arms.
    • Mooring: External turret.
    • Contract: EPC LSTK.
    • In execution since 2008.

LNG Tanks

  1. Angola Soyo LNG Terminal
    • ANGOLA LNG
    • LNG TANKS
    • SOYO (ANGOLA)
    • Tanks: 2 x 150,000 cu.m (9% Ni Full Containment). 2 LPG Full Containment Tanks (Low Temperature Carbon Steel Inner tank).
    • Contract: This contract is for construction only and includes also the construction of two LPG Full Containment tanks.
    • Consortium Partners: NAMKWENG, LION.
    • In execution since 2008.
    • First LNG and LPG tanks ever built in Angola.
  2. Arzew LNG Terminal
    • SONATRACH
    • GL-3Z
    • ARZEW (ALGERIA)
    • Tanks: 2 x 160,000 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • In execution since 2008.
    • The contract included also the design and erection of LPG Full Containment tanks.
  3. Cartagena LNG Terminal
    • ENAGAS
    • CARTAGENA III LNG TANK MURCIA (SPAIN)
    • Tanks: 1 x 128,500 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Initec.
    • On stream since 2005.
    • Tank built while the plant was in operation.
  4. Huelva LNG Terminal
    • ENAGAS
    • HUELVA III - HUELVA IV LNG TANKS ANDALUCIA (SPAIN)
    • Tanks: 2 x 150,000 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Initec.
    • On stream since 2004 (the first tank) and 2006 (the second tank).
    • Tanks built while the plant was in operation.
  5. Damietta Segas LNG Terminal
    • SEGAS
    • LNG TANKS
    • DAMIETTA (EGYPT)
    • Tanks: 2 x 150,000 cu.m (Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Bouygues Travaux Publics. The JV was in consortium with Egyptian construction companies: Orascom Construction Industry for civil works and DSD Ferrometalco for mechanical works. On stream since 2004.
    • First LNG tanks ever built in Egypt.
  6. Qatargas 1 Ras Laffan LNG Terminal
    • QATARGAS
    • RAS LAFFAN LNG STORAGE TANKS RAS LAFFAN (QATAR)
    • Tanks: 4 x 85,000 cu.m (9% Ni Full Containment).
    • Contract: EPC LSTK.
    • JV Partner: Bouygues Travaux Publics. The JV was in consortium with construction companies: MIDMAC and MEACON.
    • On stream since 1996 (the first 3 tanks) and 1998 (the fourth tank).
    • The fourth tank built while the plant was in operation.
  7. Montoir De Bretagne LNG Terminal
    • GAZ DE FRANCE
    • LNG TANKS
    • MONTOIR (FRANCE)
    • Tanks: 2 x 120,000 cu.m (Membrane Technology).
    • Contract: EPC LSTK.
    • On stream since 1981.
    • First above ground membrane LNG.

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License