Saipem Africa Pipeline References
rating: 0+x

Related Pages

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Most Recently Updated Pages



Prelude Floating LNG Terminal

14737949310_3b4bde1eee_m.jpg

Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built


  1. East Area Oil And Gas Fields
    • Nigeria
    • Mobil
    • Usari - Idoho Pipeline Replacement
    • T & I
    • 28
    • 24"
    • Crawler
    • 30 - 40
    • 2011
  2. Clov Oil And Gas Fields
    • Angola
    • Total E&P Angola
    • Block 17 Gas Export Pipeline Project - Phase 1
    • EPIC (Sealines + Subsea)
    • 1 X 2 7- 1 X 4 0
    • 16"
    • Castoro II - FDS - Saipem 3000
    • max 1,200
    • 2010
  3. Takula Oil And Gas Field
    • Angola
    • Cabinda Gulf Oil Company
    • Takula GPP Pipelines Project
    • T & I
    • 1 X 1 9- 1 X 5
    • 6" - 24"
    • Castoro II - Saipem 3000
    • max 65
    • 2009
  4. Medgaz Gas Pipeline
    • Algeria
    • Medgaz S.A.
    • Medgaz - Algeria to Spain
    • EPIC
    • 210
    • 24"
    • Castoro Sei - Crawler Saipem 7000
    • max 2,155
    • 2009
  5. Akpo Oil Field
    • Nigeria
    • Total Upstream Nigeria Limited
    • Akpo Field Development
    • EPIC (Sealines + Subsea)
    • 150
    • 16"
    • FDS
    • max 1,300
    • 2009
  6. Angola Cabinda Gulf Oil Company Malongo Terminal Oil Export Pipeline T & I (Sealines + Subsea) 30 42" Castoro II - Saipem 3000 max 35 2009
  7. Sequoia Gas Field
    • Egypt
    • Burullus Gas Company
    • Sequoia Joint Development Project
    • EPIC (Sealines + Subsea)
    • 24
    • 22"
    • FDS
    • 70 - 119
    • 2009
  8. Hasdrubal Gas Field
    • Tunisia
    • British Gas
    • Hasdrubal Offshore Pipeline
    • T & I
    • 1 X 9 6- 1 X 10
    • 18"
    • Crawler
    • 60
    • 2008
  9. Awa Paloukou Oil Field
    • Congo
    • Eni Congo
    • Awa Paloukou Sealine and Platform Installation
    • EPIC
    • 36
    • 10"
    • Castoro II
    • 80
    • 2008
  10. Egypt Petrobel Denise Project - Sealine Installation T & I 61 32" Crawler - S 355 68 2008
  11. Rosetta Gas Field
    • Egypt
    • Rashid Petroleum Company (Rashpetco)
    • Rosetta Phase III Development Project
    • T & I
    • 19
    • 18"
    • S 355
    • max 160
    • 2008
  12. Rosa Oil Field
    • Angola
    • Total E&P Angola
    • Rosa SURF Development
    • EPIC (Sealines + Subsea)
    • 1 X 5 5- 1 X 4 0
    • 8" - 10" - 12"
    • FDS - Saipem 3000
    • 1,400
    • 2007
  13. East Area Oil And Gas Fields
    • Nigeria
    • Mobil Producing Nigeria
    • East Area Projects EPC2A (Additional Oil Recovery AOR Project)
    • EPIC (Sealines + Platform)
    • 1 X 5 3- 1 X 2 1
    • 18" - 20"
    • Saipem 3000 - S 355 30
    • 2006
  14. Greenstream Pipeline Interconnector
    • Libya
    • Greenstream
    • Greenstream - Libya Gas Transmission System
    • T & I
    • 516
    • 32"
    • Castoro Sei - Crawler
    • max 1,127
    • 2004
  15. N-Kossa Oil Field
    • Congo
    • Elf Congo
    • Direct Line Nkossa to Djeno
    • EPIC
    • 62
    • 12"
    • Castoro Otto
    • 0 - 170
    • 2002
  16. Angola Texaco Panama Joint Terminalling Project EPIC 14 16" Castoro Otto 40 2001
  17. East Area Oil And Gas Fields
    • Nigeria
    • Mobil Producing Nigeria
    • Oso 2y-2 Development Project
    • EPIC (Sealines + Platform)
    • 1 X 2 1- 1 X 1 0
    • 16"
    • Castoro Otto - Saibos 230
    • 20
    • 1999
  18. Egypt Petrobel Sealine in Egypt T & I 40 24" Castoro II na 1999
  19. Kitina And Djambala Oil Fields
    • Congo
    • Agip Recherches Congo
    • Kitina Project
    • EPIC (Sealines + Platform)
    • 65
    • 14"
    • Castoro Otto
    • 137
    • 1998
  20. East Area Oil And Gas Fields
    • Nigeria
    • Mobil Producing Nigeria
    • Usari Development Project
    • EPIC
    • 1 X 2 8- 1 X 1 9
    • 24"
    • Castoro Otto
    • 16 - 25
    • 1997
  21. Miskar Gas Field
    • Tunisia
    • British Gas
    • Miskar Gas Field Development
    • T & I 122
    • 24"
    • Crawler
    • 60
    • 1994
  22. Yanga Sendji Oil Field
    • Congo
    • Elf Congo
    • Pipelaying on The Tchibouela, Yanga, Sendji and Tchendo Fields
    • EPIC
    • 324
    • 30"
    • Semac 1
    • 117
    • 1991
  23. Zatchi Oil Field
    • Congo
    • Agip Recherches Congo
    • Sealine from ZAF-1 to Shore, Zatchi Field
    • T & I
    • 76
    • 18"
    • Castoro Otto
    • 60
    • 1991
  24. Egypt WEPCO Installation Sealine and Platform T & I (Sealines + Platform) 22 12" Castoro Otto na 1991
  25. Zatchi Oil Field
    • Congo
    • Agip Recherches Congo
    • ZAF 1 Platform EPIC (Sealines + Platform)
    • 21
    • 10"
    • Castoro Otto
    • 90
    • 1988
  26. Abu Qir Gas Fields
    • Egypt
    • WEPCO
    • Sealine and Riser in Abu Qir Gas Field
    • T & I
    • 19 18"
    • Castoro II
    • max 17
    • 1985
  27. Sumed Oil Pipeline
    • Egypt
    • APCC - SUMED
    • Petroleum Marine Terminal - Crude Oil Submarine System at Alexandria
    • T & I 76 (Total)
    • 26" - 48"
    • Castoro V
    • 34
    • 1976

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License