Ruby Oil And Gas Field

Related Pages

Vietnam Oil & Gas Fields

Petronas Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Petronas
  • Country: Vietnam
  • Location:
  • Production start: 2010
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The overall Ruby Field development consists of the existing Ruby A and Ruby B platforms, which currently supplies the full well stream to the Ruby II FPSO, and will also include the Pearl and Topaz fields which will be tied-in to the FPSO in the near future.
  • Ruby II FPSO is based on total repair, life extension and conversion of the 1990 built Aframax tanker MT Cherry II.
  • The FPSO features a bow mounted turret with nine (9) mooring lines and slots for a total of five (5) production risers and three (3) gaslift risers.
  • The topsides are designed for a throughput of 45,000 barrels of total liquid per day, and in addition provides gas treatment and compression facilities to handle 11.5 million standard cubic feet of gas per day.
  • FPSO Ruby II replaced the Ruby Princess FPSO

Contractors

  • PTSC: Construction of Ruby A and Ruby B Topsides
  • Petrofac Rnz:
    • Ruby RBDP-B Debottlenecking Project
    • Topaz and Diamond Development
    • Provision of Ruby A Platform Re-Structure Analysis

History

  • 2010 - FPSO Ruby II achieves first oil

Geology

Links

  1. International Protective Coatings Platform References
  2. Petrofac Rnz Offshore And Platform References
  3. FPSO Ruby II achieves first oil

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License