Ruby Gas Field
Related Pages
Indonesia Oil & Gas Fields
Mubadala Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Mubadala
- Country: Indonesia
- Location: 3.58 - Sebuku PSC, Makassar Strait between the islands of Kalimantan and Sulawesi
- Production start: 2013
- Partners: Total & Inpex
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: Expected to 100 million cubic feet oil per day
Description
- The field is being developed as a tie back to the Total operated Senipah Gas and Condensate Field by a 312 kilometer-long subsea pipeline
- The development utilises a tripod wellhead platform (WHP) and the processing and quarters platform (PQP)
- Early production of Ruby Field is expected to 100 million cubic feet oil per day
- The project is classified as a marginal field with estimated production for 10 years
- Ruby Field, Sebuku Block is targeted to start flowing natural gas in September 2013
Contractors
- Saipem: WHP and PQP Platforms - EPIC
- Swiber: Gas export line
- Geocean: Pipeline installation
- FoundOcean: Grouting for WHP & PQP Jackets
History
- 1997 - PSC signed
- 2013 - First gas produced
Geology
Links
- Indonesia Exploration And Production Blocks
- Serimax Asia Pipeline References
- Saipem Saipem Fixed Offshore Production Facilities Major Projects
- FoundOcean Subsea References
- Serimax Asia Pipeline References
- Ruby Field To Start Production In September 2013
- Mubadala Petroleum starts production at the Ruby gas field in Indonesia
page revision: 10, last edited: 27 Jul 2015 19:53