Ruby Gas Field

Related Pages

Indonesia Oil & Gas Fields

Mubadala Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Mubadala
  • Country: Indonesia
  • Location: 3.58 - Sebuku PSC, Makassar Strait between the islands of Kalimantan and Sulawesi
  • Production start: 2013
  • Partners: Total & Inpex
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: Expected to 100 million cubic feet oil per day

Description

  • The field is being developed as a tie back to the Total operated Senipah Gas and Condensate Field by a 312 kilometer-long subsea pipeline
  • The development utilises a tripod wellhead platform (WHP) and the processing and quarters platform (PQP)
  • Early production of Ruby Field is expected to 100 million cubic feet oil per day
  • The project is classified as a marginal field with estimated production for 10 years
  • Ruby Field, Sebuku Block is targeted to start flowing natural gas in September 2013

Contractors

  • Saipem: WHP and PQP Platforms - EPIC
  • Swiber: Gas export line
  • Geocean: Pipeline installation
  • FoundOcean: Grouting for WHP & PQP Jackets

History

  • 1997 - PSC signed
  • 2013 - First gas produced

Geology

Links

  1. Indonesia Exploration And Production Blocks
  2. Serimax Asia Pipeline References
  3. Saipem Saipem Fixed Offshore Production Facilities Major Projects
  4. FoundOcean Subsea References
  5. Serimax Asia Pipeline References
  6. Ruby Field To Start Production In September 2013
  7. Mubadala Petroleum starts production at the Ruby gas field in Indonesia

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License