Rhourde Oulad Djemma Oil Fields

Related Pages

Algeria Oil & Gas Fields

Bhp Billiton Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: BHP Billiton
  • Country: Algeria
  • Location: Berkine Basin
  • Production start: 2004
  • Partners: ENI
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The ROD Integrated Development consists of the development of six satellite oilfields in the Berkine Basin.
  • Associated gas and water is re-injected into the reservoir to provide pressure support to the reservoir
  • The processing facility has a capacity of 80,000 bpd
  • The development produces Saharan Blend Crude Oil

Contractors

  • Saipem: Integrated project EPC

History

  • 2004 - First oil produced

Geology

Links

  1. Saipem Gas And Oil Production And Treating Facilities References
  2. BHP Billiton Announces First Production From ROD Integrated Development In Algeria

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License