Ras Tanura Refinery Expansion Project
rating: 0+x

Related Pages

Refineries in Saudi Arabia

Saudi Aramco Refineries



Refinery News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Refinery\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

  • Want a weekly review of refining news?

Refining Blog Entries


Summary Information

  • Ownership: Saudi Aramco
  • Website: http://www.saudiaramco.com/
  • Wiki Page: Ras Tanura Refinery
  • Location: Ras Tanura, Eastern Province of Saudi Arabia
  • Capacity:
    • Before:27.5 million tons/annum & 550,000 bbl/day
    • After: 47.5 million tons/annum & 950,000 bbl/day
  • Nelson Complexity:
  • Project Stage:
  • Expected Completion:
  • Budget: $8 Billion

The Project

  • Project Type:
  • Project Summary:
  • Main Contractors
    • WorleyParsons: Project management, front-end engineering design (FEED) development, contract bid package development, detailed design support, detailed design package preparation, and construction management services

Refining Units

  • Crude distillation unit - 400,000
  • Vacuum distillation unit, - 210,000
  • Visbreaker crude unit, -120,000
  • Continuous catalyst regenerator Reformer - 50,000
  • Isomerization unit, - 20,000
  • Diesel hydrotreater, - 90,000
  • Hydrogen plant - 30-MMSCFD
  • Sulfur Recovery Unit - 185-TPD (two trains)
  • Amine regeneration unit - 820-GPM
  • Sour water stripper - 225-GPM

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • -

History

  • 2007 - WorleyParsons Awarded Services Contracts

Other Information

  • -

Relevant Links


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License