Qalhat LNG Terminal
Summary Information
- Ownership: Qalhat LNG,
- Government of Oman (46.84%)
- Oman LNG L.L.C (36.80%)
- Union Fenosa Gas S.A. (7.36%)
- Itochu (3%)
- Mitsubishi Corporation (3%)
- Osaka Gas (3%)
- Website: http://www.qalhatlng.com
- Location: Qalhat
- Capacity: 3.3 million tons/annum
- Status: In Operation
Brief Description
- A single train liquifaction plant
Technical Details
- Storage capacity:
- Constructor:
- Chiyoda: FEED
- Chiyoda-Foster Wheeler: Detailed engineering, procurement and construction (EPC)
- DYWIDAG: Full containment tank, Design & Build, Capacity: 2 x 120,000 m³
- Licensor:
History
- 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC)
- 2005 - First cargo is shipped from the terminal to Spain
- 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG
Ongoing Projects/Project Status
- -
Suppliers / Customers
- Suppliers:
- Among the fields supplying the terminal are the Saih Nihayda Gas And Condensate Field, the Barik Gas Field and the Saih Rawl Gas Field
- Customers:
- Union Fenosa Gas 1.65 mtpa
- Mitsubishi Corporation 0.8 mtpa
- Osaka Gas 0.8 mtpa.
Other Information
- -
Relevant Links
- Terminal Profile
- DYWIDAG LNG Tank References
- Chiyoda LNG References
- Chiyoda Secured LNG Train EPC Contract in Oman
- Chiyoda-Foster Wheeler Secures LNG Train EPC Contract in the Sultanate of Oman
- Acquisition of Equity Interest in Qalhat LNG
page revision: 14, last edited: 05 Jan 2014 14:53