PTSC Lam Son FPSO

Related Pages

Vietnam FPSOs

Yinson FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

Brief Description

  • “PTSC Lam Son” is designed with a minimum storage capacity of 350,000 barrels, capable of processing 18,000 barrels per day and working continuously offshore (without dry docking) for ten years.
  • The systems on the FPSO include: power generators, boilers, separator, compressor, water injection, metering, anchor, 5 risers, 2 umbilicals to wellhead platforms and fire-fighting/ life-saving equipment

Contractors

  • PTSC: Full project scope, ranging from finance arrangement, engineering, procurement, repair & conversion, commissioning, transportation, offshore installation, to operation & maintenance
  • Keppel: FPSO conversion

Status

  • In operation

History

  • 2011 - MOU signed for provision of FPSO
  • 2014 - First production

Other Information

  • -

Links

  1. Head of agreement signed between Lam Son JOC & PTSC for the provision of FPSO for the development of Thang Long – Dong Do field
  2. PTSC Lam Son FPSO Naming Ceremony
  3. Yinson's Floating Production, Storage and Offloading ("FPSO") PTSC Lam Son Starts Production

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License