Poinsettia Gas Field
Related Pages
Trinidad and Tobago Oil & Gas Fields
BG Group Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: BG-Group
- Country: Trinidad and Tobago
- Location: North Coast Marine Area (NCMA)
- Production start: 2009
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- Located off the northwest shore of Trinidad in water 530 feet deep
- The Poinsettia platform can produce as much as 350 million standard-cubic-feet-per-day of gas
- Gas is transported via a 20-inch diameter pipeline to the Hibiscus platform before final pipeline transmission to shore
- The gas is supplied to the Atlantic LNG Terminal
Contractors
- Fluor / McDermott: program management, engineering, procurement, construction and installation (EPCI) of the 4,000-ton topsides for the offshore drilling and gas production platform
- Tofco: Deck Fabrication
- Derescom: Fuel Gas Treatment/Pressure Reduction Package
- FoundOcean: Grouting
History
- 2000 - The Government of Trinidad & Tobago approved the development
- 2007 - Fluor / McDermott awarded topsides contract
- 2009 - First gas produced
Geology
Links
- Tofco Platform References
- FoundOcean Subsea References
- Mcdermott Platform References
- Derescom Oil And Gas Processing References
- Trinidad & Tobago Government gives go-ahead to new gas province
- Fluor-Led Consortium to Build Offshore Drilling & Gas Production Platform off Coast of Trinidad
- Fluor-Led Offshore Project Reaches First Gas
page revision: 13, last edited: 17 Jun 2015 08:10