Probably the most exciting project in the world of Oil & Gas. The platform will be the largest ship ever built
- Schwedt Refinery
- Desulphurization plant - hazop findings dk2
- Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
- Commissioning: 2014
- Buna Sow Leuna Refinery
- alkylation plant
- Revamp of alkylation plant to increase alkylate yield
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2014
- Schwechat Refinery
- rd4 program
- EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
- Client: OMV AG
- Location: Schwechat / Austria
- Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
- Commissioning: 2014
butadiene production unit
EPCM-Contractor for capacity extensions to Butadiene production unit
Client: OMV AG
Location: Schwechat / Austria
Scope of work:
Project management
Basic engineering
Detailed engineering
Procurement
Site and construction supervision
Commissioning assistance
Commissioning: 2014
revamp vacuum plant
Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process
Client: PCK Raffinerie GmbH Schwedt
Location: Schwedt / Germany
Scope of work:
Basic engineering
Detailed engineering
Procurement
Construction and installation supervision
Commissioning support
Commissioning: 2013
propane deasphalting plant (pda)
The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction.
Client: H&R Ölwerke Schindler GmbH
Location: Hamburg / Germany
Scope of work:
Basic engineering
Detailed engineering
Procurement
Construction supervision
Commissioning
Commissioning: 2011
crude oil distillation plant 4 schwechat
EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
Client: OMV
Location: Schwechat / Austria
Scope of work:
Detailed engineering
Procurement and expediting
Construction and installation supervision
Commissioning
Commissioning: 2010
revamp crude oil distillation plant top1
Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
Client: PCK Raffinerie Schwedt
Location: Schwedt / Germany
Scope of work:
Detailed engineering
Construction and installation supervision
Procurement
Expediting
Commissioning: 2010
revamp fcc gas concentration plant
Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
Client: PCK Raffinerie GmbH Schwedt
Location: Schwedt / Germany
Scope of work:
Basic engineering
Detailed engineering
Procurement and expediting
Construction and installation supervision
Commissioning
Commissioning: 2010
revamp of hds plant
Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
Client: OMV AG
Location: Schwechat, Austria
Scope of work:
Project management
Detailed engineering
Procurement
Construction supervision
Commissioning
Commissioning: 2008
used oil re- refining plant
Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology
Client: Puralube Raffinerie GmbH
Location: Zeitz, Germany
Scope of work:
Basic engineering
Detailed engineering
Procurement support
Commissioning support
Commissioning: 2008
fcc-overcracking-plant
FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality
Client: PCK Raffinerie GmbH, Schwedt
Location: Schwedt, Germany
Scope of work:
Detailed engineering
Procurement
Construction supervision
Commissioning: 2007
Investment: EUR 29 million (in total)
debottlenecking of refinery gas plant
Debottlenecking of refinery gas plant
Client: OMV Deutschland GmbH
Location: Burghausen, Germany
Scope of work:
Detailed engineering
Procurement
Construction supervision
Site management
Commissioning: 2007
revamp hf alkylation
Revamp of existing HF alkylation
Client: PCK Raffinerie GmbH, Schwedt
Location: Schwedt, Germany
Scope of work:
Basic engineering (UOP Schedule A)
Detailed engineering
Procurement
Construction supervision
Commissioning: 2007
ok 95 - transfer line
Transfer line OK 95 (with/without ETBE)
Client: TOTAL Raffinerie Mitteldeutschland GmbH
Location: Leuna, Germany
Scope of work:
Detailed engineering
Procurement
Construction supervision
Commissioning: 2006
revamp of hds-1 plant
Revamp of HDS-1 plant
Client: OMV Deutschland GmbH
Location: Burghausen, Germany
Scope of work:
Detailed engineering
Procurement
Construction supervision
Commissioning 2006
new refinery gas plant
New refinery gas plant Modification of associated existing units
Client: BAYERNOIL Raffineriegesellschaft
LocationIngolstadt, Germany
Scope of work:
Detailed engineering
Procurement (support)
Authority engineering
Investment cost estimate
Construction supervision (piping)
Acceptance tests/Tests
Start-up assistance
Commissioning: 2005
revamp of coking plant
Project: Revamp of coking plant with capacity increase
Client: BP Erdöl-Raffinerie-Emsland
Location: Lingen, Germany
Scope of work:
Detailed engineering
Procurement
Construction supervision
Commissioning: 2004
fcc column
Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one
Client: Raffinerie GmbH, Schwedt
Location: Schwedt, Germany
Scope of work:
Basic engineering
Detailed engineering
Procurement
Construction supervision
Acceptance tests/Tests
Start-up assistance
Commissioning: 2004
revamp of light gasoline isomerization
Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
Location: Lingen, Germany
Scope of work:
Extended basic engineering
Authority engineering
Investment cost estimate
Procurement support
Detailed engineering
Commissioning: 2002
desulphurization unit
Desus 2
Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph
Client: PCK Raffinerie GmbH
Location: Schwedt, Germany
Scope of work:
Basic engineering
Detailed engineering
Procurement
Construction supervision
Start-up assistance
Commissioning: 2002