PM-3 CAA Oil And Gas Fields

Related Pages

Malaysia Oil & Gas Fields

Talisman Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Talisman
  • Country: Malaysia
  • Location: PM-3
  • Production start: 1997
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The PM-3 CAA project, which involves development of the West Bunga Kekwa, East Bunga Kekwa-Cai Nuoc, East Bunga Raya, West Bunga Raya, NW Bunga Raya, Bunga Tulip and Bunga Seroja fields
  • Four wellhead platforms, a central processing platform, compression annex platform, floating storage offloading vessel and inter-field pipelines have been installed.
  • These facilities have a production capacity of 60,000 bbls/d of oil and 270 mmcf/d of gas.
  • The Bunga Orkid/Bunga Pakma gas field complex was developed as phase three and includes Bunga Orkid-A platform and FSO Orkid
  • Gas is supplied via a 24-inch 170 km pipeline from PM-3 CAA to the Resak Platform

Contractors

  • MMCOG:
    • Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Topside
    • Detailed Design of Bunga Kekwa 'C' (BK-C) Annex Substructure
  • Hyundai Heavy Industries: Phase 2 Topside
  • FoundOcean: Bunga Raya 'A'
  • MMHE:
    • B. Raya E - Jacket
    • Conversion of FSO Orkid
  • SDE: Bunga Raya E - Deck, Topside
  • Kavin Engineering: TML Bunga RAYA-A (BR-A) Platform, Sand Cleaning System
  • Petrofac RNZ: Bunga Tulip “A” Development
  • Bluewater: External Turret Mooring system for FSO Orkid
  • BC Petrochemical: Chemical Injection System
  • ICON Engineering:
    • Conceptual design & installation engineering, followed by the structural & geotechnical detailed design for the BR-A Annexe Monopods
    • Bunga Kekwa C Annexe Platform, Conceptual Design and Installation

History

  • 1997 - Phase 1 oil production commenced
  • 2003 - phase 2 start up
  • 2006 - Bunga Tulip came onstream
  • 2008 - FSO Orkid was completed
  • 2009 - Phase 3 production starts

Geology

Links

  1. MMCOG Platform References
  2. Icon Engineering Platform References
  3. Jotun Platform References
  4. Hyundai Heavy Industries Platform References
  5. FoundOcean Subsea References
  6. Kavin Engineering Oil And Gas Processing References
  7. Anggerik Laksana Platform References
  8. Bluewater Mooring References
  9. Petrofac RNZ Offshore And Platform References
  10. BC Petrochemical Oil And Gas Processing References
  11. Fiberbond Offshore Platform References
  12. Talisman Announces First Oil From The PM-3 CAA Phase 2 & 3 Project In The Overlapping Area Between Malaysia And Vietnam
  13. MMHE Completed Another Conversion
  14. FSO Orkid successfully received first oil