Panyu 4-2/5-1 Oil Fields

Related Pages

China Oil & Gas Fields

CNOOC Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: CNOOC
  • Country: China
  • Location: Eastern South China Sea
  • Production start: 2003
  • Partners: Devon
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The field development included two platforms and a Floating Production, Storage and Offloading vessel (FPSO), Hai Yang Shi You 111 FPSO

Contractors

  • UOCC: Platform construction
  • Kavin Engineering: Well head Platform Modifications - Pre-Commissioning and Commissioning Procedure & IOM
  • Saipem: T&I

History

  • 2003 - First oil produced
  • 2013 - Adjustment project completed

Geology

Links

  1. International Protective Coatings Platform References
  2. Kavin Engineering Oil And Gas Processing References
  3. FoundOcean Subsea References
  4. CNOOC Get New Production Through Oilfield PY 4-2/5-1
  5. CNOOC - Two New Projects Started Production Successfully

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License