Pagerungan Gas Field

Related Pages

Indonesia Oil & Gas Fields

JAPEX Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator:
  • Country:
  • Location: Kangean block
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • Tripatra:
    • Preliminary Engineering for Platform
    • FEED for gas processing

History

  • 1994 - Gas production started
  • 2006 - Production temporarily halted due to pipeline rupture

Geology

Links

  1. Tripatra Platform References
  2. Tripatra Oil And Gas Processing References
  3. EMP Temporarily Halts Production As Pipeline Broke

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License