Northern Gateway Oil Pipeline Project

Related Pages

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Summary Information

  • Source: Bruderheim, Alberta, Canada
  • Destination: Kitimat, British Colombia, Canada
  • Ownership: Enbridge
  • Website: http://www.enbridge.com/
  • Length: 1,177 kilometres ( miles)
  • Capacity:
    • 525,000 barrels of oil per day
    • 193,000 bpd of condensate
  • Crude Type: Heavy Oil Sands Crude

The Route

  • The pipeline will travel directly West from Bruderheim north of Edmonton in Alberta, to Kitimat on the coast of British Colombia

Pipeline Status

  • Planned

History

  • 2010 - Enbridge filed an application with the National Energy Board for the construction and operation of the Enbridge Northern Gateway Pipeline
  • 2011 - Enbridge announced agreements that fully subscribe for long term service and capacity

Other Information

  • Northern Gateway Project is a proposed $5.5-billion 1,177-km twin pipeline system and marine terminal. The proposed project, would transport 525,000 barrels per day (bpd) of oil for export and import 193,000 bpd of condensate.

Links


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License