Nizhny Novgorod Refinery Coker Project
rating: 0+x

Related Pages

Refineries in Russia

Lukoil Refineries



Refinery News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Refinery\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

  • Want a weekly review of refining news?

Refining Blog Entries


Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary: Apart from a delayed coker, the complex, with the total annual feed rate of 2.1 million tons, features a diesel hydrotreater, a gas fractionator, hydrogen and sulfur production units, as well as infrastructure facilities. Once the new facility is commissioned, the Nizhny Novgorod refinery will significantly reduce its production of fuel oil, increase refinery yield up to 95.5% and achieve higher synergy with the fluidized catalytic-cracking units already in operation. As a result, the yield of light petroleum products will grow from the actual 64% up to 76%.
  • Main Contractors
    • CB&I: detailed engineering, procurement and supply of process equipment, including two proprietary delayed coking heaters

Refining Units

  • Delayed coker
  • diesel hydrotreater,
  • gas fractionator,
  • hydrogen
  • sulfur production unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • -

History

  • 2017 - Final investment decision taken
  • 2017 - CB&I awarded EPC contract
  • 2018 - Construction started

Other Information

  • -

Relevant Links

  1. Lukoil Takes Final Investment Decision On Delayed Coker At Nizhny Novgorod Refinery
  2. CB&I Announces Engineering, Procurement and Supply Award for LUKOIL
  3. Lukoil Starts Construction Of Petroleum Residue Recycling Facility At Nizhny Novgorod Refinery

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License