Niger Chad Crude Oil Pipeline

Related Pages

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source: Agadem bloc, Niger
  • Destination: Chad
  • Ownership:
  • Website:
  • Length: 600 kilometres (373 miles)
  • Capacity: barrels of oil per day
  • Crude Type: Niger

Brief Description

  • About 193 km of the pipeline will link the Agadem bloc to the Chad border. Then another 400 km of pipeline will be built in Chad to connect to the existing Chad-Cameroon Oil Pipeline, for deliveries to the port of Kribi in Cameroon

Pipeline Status

  • Planned

History

  • 2012 - Niger signs MOU with Chad

Other Information

  • -

Links


Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License