Niger Chad Crude Oil Pipeline
Summary Information
- Source: Agadem bloc, Niger
- Destination: Chad
- Ownership:
- Website:
- Length: 600 kilometres (373 miles)
- Capacity: barrels of oil per day
- Crude Type: Niger
Brief Description
- About 193 km of the pipeline will link the Agadem bloc to the Chad border. Then another 400 km of pipeline will be built in Chad to connect to the existing Chad-Cameroon Oil Pipeline, for deliveries to the port of Kribi in Cameroon
Pipeline Status
- Planned
History
- 2012 - Niger signs MOU with Chad
Other Information
- -
Links
page revision: 2, last edited: 02 Jul 2012 09:24