Netra Nogat Pipeline System
Summary Information
- Source: Offshore Netherlands
- Destination: Den Helder
- Ownership: 45% Energie Beheer Nederland B.V. (EBN), 48.2% GDF Suez, and 1.8% by Venture Production.
- Website: http://www.nogat.nl/
- Length: 264 kilometres ( miles)
- Capacity: 12 billion cubic meters per annum
- Status: Operating
Details
- A natural gas pipeline system, which connects Dutch continental shelf with an onshore gas plant and terminal at Den Helder, the Netherlands.
- It also transports gas from the Danish section of the North Sea, via the Tyra Oil And Gas Field
Contractors
- McDermott-ETPM: Pipeline installation
Related Fields
- A12a Gas Fields
- F3 FA Gas Field
- F15a Gas Fields
- L05a Gas Fields
- L8 And L5 Offshore Gas Fields
- L09a and L09b Gas Fields
- M07 Gas Fields
History
- 1992 - Pipeline commissioned
- 2008 - GDF acquires a 30% share in the pipeline from NAM
- 2009 - Venture Production acquires a minor share from Lundin
- 2011 - GDF Suez Becomes Majority Shareholder In NOGAT
Links
- Wikipedia Page
- LUNDIN PETROLEUM SELLS SHARES IN NOGAT B.V, NETHERLANDS
- Serimax Europe Pipeline References
- NAM and GDF SUEZ commence exclusive negotiations for a package of assets on the Dutch Continental Shelf
- GDF Suez Becomes Majority Shareholder In NOGAT B.V.
page revision: 15, last edited: 30 Jun 2015 09:16