Nasr Oil Field

Related Pages

UAE Oil & Gas Fields

ADMA Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: ADMA OPCO
  • Country: UAE - Abu Dhabi
  • Location: 131 km northwest of Abu Dhabi
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: 22,000 bpd

Description

  • The Nasr Full Field Development Project includes seven wellhead towers, super complex facilities including gas processing and oil separation production facilities, utilities platform, living quarters, infield subsea pipelines and an export pipeline to Das Island
  • Phase II is designed to increase production to 65,000 bpd
  • It includes the addition of a gas treatment platform, a separation platform nad an accommodation platform as well as modifications to existing structures

Contractors

Phase II

  • Fluor: front-end engineering and design (FEED)
  • AMEC: Project Management Consultancy (PMC) services contract

Phase II

  • Technip: Project management consultancy (PMC) services
  • KBR: Engineering design and support services
  • HHI: Engineering, procurement, construction, installation and commissioning work
    • Gas treatment platform, a separation platform, an accommodation platform;
    • laying 144 km subsea power and 55 km infield cables;
    • modifying an existing manifold tower and two wellhead towers

History

  • 2011 - Fluor Wins Offshore FEED Contract
  • 2012 - AMEC awarded PMC services contract
  • 2014 - Project Management Consultancy services for the Nasr Phase II awarded to Technip
  • 2014 - Platforms EPC given to HHI

Geology

Links

  1. AMEC awarded PMC services contract for ADMA OPCO’s multi-billion dollar Nasr and Umm Lulu fields, UAE
  2. Fluor Wins Offshore FEED Contract for Nasr Field in Abu Dhabi
  3. KBR Awarded Major Engineering Design Contract by Hyundai Heavy Industries Co., Limited for the Al-Nasr Full Field Development Project
  4. ADMA-OPCO selects Technip for Project Management Consultancy services for the Nasr Phase II Full Field Development Project
  5. Hyundai Heavy Industries Wins $1.94 Billion Offshore Order in UAE
  6. ABB to provide power and automation solutions for oilfields off UAE coast

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License