N'Goma FPSO

Related Pages

Angola FPSOs

SBM Offshore FPSOs

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

Brief Description

  • The FPSO will have a total oil processing capacity of 100,000 bpd, gas handling capacity of 115 MMSCF per day and water Injection capacity of 120,000 bpd.
  • The vessel was previously known as Xikomba FPSO

Contractors

  • SBM Offshore: FPSO refurbishment
  • Dyna-Mac: Five units of topside modules
  • Paenal:
    • Construction of Sulphate Removal Package and the Hot Oil Pump modules
    • Integration of topsides modules

Status

  • In Operation

History

  • 2011 - Formerly Xikomba FPSO it was disconnected from Angola Block 15
  • 2014 - The Vessel arrives in Angola
  • 2014 - First oil

Other Information

  • -

Links

  1. Dyna-Mac Topsides Module Business
  2. Angolan shipyard Paenal celebrates the arrival of N’Goma FPSO
  3. Another milestone reached for Angola Block 15/06: N'Goma FPSO ready to sail away
  4. N’GOMA FPSO Producing And On Hire

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License