Mossel Bay LNG Terminal
rating: 0+x

Related Pages

LNG Import Terminals in Africa

PetroSA LNG Terminals

LNG News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/lng\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More LNG News

LNG Blog Entries

Summary Information

Brief Description

  • The offloading facility would include, inter alia, two storage regasification vessels, two submerged turret loading buoys, anchor system for the buoys, pipeline connections and support vessels.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Worleyparsons: Feasibility study and Front- End Engineering Design (FEED)
  • Tractebel: Owner's Engineering for Deepwater Port and subsea pipeline

Ongoing Projects/Project Status

  • Project is currently on hold

Suppliers / Customers

  • Suppliers:
  • Customers: The facility is to supply the next door GTL facility

History

  • October 2010 - Project postponed for economic reasons
  • 2012 - Worleyparsons Appointed for Feasibility study and Front- End Engineering Design (FEED)

Other Information

  • -

Relevant Links

  1. Tractebel Engineering LNG References
  2. Worleyparsons Appointed To Design New LNG Facility
  3. PetroSA RECEIVES FIRST VERSION OF DRAFT SCOPING REPORT FOR PROPOSED MOSSEL BAY LIQUIFIED NATURAL GAS (LNG) FACILITY

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License