Montrose Arbroath Oil And Gas Field
Related Pages
UK Oil & Gas Fields
Talisman Oil & Gas Fields
Upstream News
For More Upstream News
- Glossary of Upstream Terms
- Unconventional Oil And Gas Resources
- Global Floating Production Storage And Offloading Vessels (FPSO)
Summary Information
- Operator: Talisman
- Country: UK
- Location: Central North Sea
- Production start:
- Partners: Marubeni
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The fields are operated using two small manned steel platforms, Montrose A & Arbroath
- The £1.6 billion MonArb Area Redevelopment Project will mean the production of a further 100 million barrels of oil equivalent from the existing Montrose, Arbroath, Brechin, Arkwright, Carnoustie and Wood fields.
- The project also includes consent for the new Cayley, Godwin and Shaw fields.
Contractors
- Union Industrielle et d’Enterprise (UIE): Montrose Platform
- Highlands Fabricators: Arbroath Platform
- HSM Offshore:
- Montrose Living Quarter
- WaGE Compression and Treatment Module
- Stolt Offshore: A 10-inch, 8.5km water injection line between the Montrose and Arbroath platforms
- Heerema Marine Contractors: Arbroath T&I
Montrose Area Redevelopment (MAR) Project
- Subsea 7: Project management, engineering, procurement, fabrication and installation of two 5km pipeline bundles
- Offshore Group Newcastle Limited: Engineering, procurement and fabrication of the jacket
- AMEC: FEED (front end engineering design) for the new bridge-linked platform brownfield scope and upgrade of the existing Montrose Alpha platform
- OGN: Engineering, procurement and fabrication of the oil and gas jacket, for the new bridge-linked platform for the Montrose Area Redevelopment (MAR) Project.
- KWsubsea: Assessment of HPHT Pipelines for Shaw and Cayley
History
- 1976 - Montrose development approval given
- 1987 - Arbroath development approval given
- 1989 - Arbroath platform installed
- 2005 - Talisman acquires Paladin, becoming the operator of the field
- 2006 - Wood and Gas Export (WaGE) module installed on the Montrose platform
- 2007 - First production from the Wood field
- 2009 - Cayley, Godwin and Shaw fields discovered
- 2012 - Montrose Area Redevelopment approved
- 2013 - Subsea 7 Wins Pipeline Bundle Project
Geology
Links
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- HSM Offshore Platform References
- FoundOcean Europe Subsea References
- Serimax Pipeline References
- KWsubsea High Pressure High Temperature Systems References
- Stolt Offshore Announces $120 Million of Contract Awards in the North Sea
- Talisman to Acquire Paladin Resources Plc for Pounds Sterling 1,218 Million 'C$2,521 Million'
- Marubeni announce oil discovery in UK Central North Sea
- Petrofac Brownfield Secures WaGE Project
- WaGE Meets Major Milestones
- Talisman Energy Announces First Production From the Wood Field in the North Sea
- Brown Field Allowance sparks new wave of oil investment
- AMEC awarded a five-year brownfield topside projects contract by Talisman Energy (UK) Limited
- Subsea 7 UK & Canada Wins Pipeline Bundle Project for Talisman Sinopec UK Energy’s Montrose Area Redevelopment Project
- OGN awarded Multi-Million Pound Talisman Jacket Contract
page revision: 22, last edited: 29 Jun 2015 08:17