Monkey Island LNG Export Terminal Project
Summary Information
- Ownership: SCT&E LNG
- Website: http://www.sctelng.com/
- Location: Cameron Parish, Louisiana
- Capacity: 12.0 million tons/annum
- Status: Planned
Brief Description
- The Project facilities are anticipated to include six LNG trains, three LNG storage tanks with capacity of approximately 160,000 cubic meters, and vessel loading facilities.
- Each of the LNG trains will be capable of producing up to two million tonnes per annum (mtpa) of LNG, for a total capacity of twelve mtpa of LNG.
- Due to the size of the export terminal, the project will be built in three phases, with approximately four mtpa produced per phase.
- The project will be a tolling terminal
Technical Details
- Storage capacity: 3*160,000 cubic meters
- Constructor:
- Technip - Master Services Agreement (MSA)
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 201X
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2014 - DOE approves exports
- 2016 - Technip was awarded a Master Services Agreement (MSA)
Other Information
- -
Relevant Links
- SCT&E LNG receives approval from the Department of Energy (DOE) to export 12 million tons per annum (mtpa) of Liquefied Natural Gas
- Technip awarded MSA for SCT&E LNG’s Monkey Island project in Louisiana, USA