Mondo Oil Field

Related Pages

Angola Oil & Gas Fields

Exxon Oil & Gas Fields

Upstream News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Upstream\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Upstream News



Summary Information

  • Operator: Exxon
  • Country: Angola
  • Location: Block 15
  • Production start: 2008
  • Partners: Exxon - 40%, BP - 26.67%, Eni - 20%, Statoil - 13.33%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field is part of the Kizomba C Project, along with the Saxi-Batuque Oil Field
  • It utilises the Mondo FPSO with is capable of processing 100,000 barrels of oil per day (bopd) with a storage capacity for 1.6 million barrels of oil
  • The development included 17 subsea trees and five manifolds

Contractors

  • Keppel: Conversion, including installation and integration of the topside modules, installation of an external turret and helideck, fabrication and installation of a flare tower and bow modification work
  • Vetco Gray: Engineering, procurement and construction (EPC) of 17 subsea trees, five manifolds, topside and subsea control systems and flowline connection systems

History

  • 2000 - Mondo oil field discovered
  • 2006 - SBM Offshore awarded FPSO lease and operation contract
  • 2006 - Vetco Gray awarded subsea contract
  • 2007 - FPSO conversion completed
  • 2008 - First Oil produced

Geology

Links

  1. Eighth find in Angola block
  2. New Orders For SBM Offshore Chevron Awards Frade FPSO
  3. Vetco Wins Kizomba C Work Offshore Angola
  4. Keppel clinches S$127 million FPSO conversion and repair contracts
  5. Eni starts production from Mondo field, deepwater Angola

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License