Monarch Oil Pipeline

Related Pages

USA Oil Pipelines

Enbridge Oil Pipelines

Pipeline News

{"module":"feed\/FeedModule","params":{"src":"http:\/\/killajoules.wikidot.com\/feed\/pages\/pagename\/blog%3A_start\/category\/blog\/tags\/Pipeline\/limit\/10\/t\/My+Blog","limit":"5","module_body":"* %%linked_title%%"}}

For More Pipeline News

Pipeline Blog Entries


Summary Information

  • Source: Cushing, Oklahoma, USA
  • Destination: Houston, Texas, USA
  • Ownership: Enbridge
  • Website: http://www.enbridge.com
  • Length: kilometres ( miles)
  • Capacity: 350,000 barrels of oil per day
  • Crude Type: Light sweet crude

The Route

  • From Cushing to Houston

Pipeline Status

History

  • 2011 - The project was replaced by the Wrangler project

Other Information

  • The pipeline will be 24” in diameter
  • The crude pipeline could carry as much as 350,000 bpd of oil, but will likely begin with a 150,000 bpd initial phase

Links

  1. Enbridge Investor Presentation, 2010
  2. Enterprise and Enbridge to Develop Crude Oil Pipeline from Cushing to the Gulf Coast

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License